4. Press the Power On switch.
5. Check your display or ASCII terminal for configuration information displayed as
the
power-on self-test (POST) begins. The system beeps once to indicate it is
working properly.
If no operating system is installed, you are prompted to select the operating
system installation device.
Chapter 1. System Startup
1-7
Содержание F50 RS/6000 7025
Страница 1: ...IBM RS 6000 7025 F50 Series IBM User s Guide SA38 0540 01...
Страница 16: ...xvi IBM RS 6000 7025 F50 Series User s Guide...
Страница 18: ...xviii IBM RS 6000 7025 F50 Series User s Guide...
Страница 42: ...2 16 IBM RS 6000 7025 F50 Series User s Guide...
Страница 108: ...3 40 IBM RS 6000 7025 F50 Series User s Guide...
Страница 179: ...d Carefully pull the adapter out of the system Chapter 5 Installing Options 5 35...
Страница 214: ...10 Connect the connector from the EPOW cable to backplane D as shown 5 70 IBM RS 6000 7025 F50 Series User s Guide...
Страница 216: ...c Connect the other end of the power cable to the power supply 5 72 IBM RS 6000 7025 F50 Series User s Guide...
Страница 221: ...Chapter 5 Installing Options 5 77...
Страница 246: ...5 102 IBM RS 6000 7025 F50 Series User s Guide...
Страница 270: ...6 24 IBM RS 6000 7025 F50 Series User s Guide...
Страница 296: ...7 26 IBM RS 6000 7025 F50 Series User s Guide...
Страница 322: ...B 4 IBM RS 6000 7025 F50 Series User s Guide...
Страница 326: ...C 4 IBM RS 6000 7025 F50 Series User s Guide...
Страница 341: ...expect 8 r or 7 r or 6 r or 4 r or 3 r delay 2 done Appendix D Modem Configurations D 15...
Страница 348: ...D 22 IBM RS 6000 7025 F50 Series User s Guide...
Страница 352: ...E 4 IBM RS 6000 7025 F50 Series User s Guide...
Страница 359: ...Index X 7...
Страница 360: ...X 8 IBM RS 6000 7025 F50 Series User s Guide...
Страница 362: ...X 10 IBM RS 6000 7025 F50 Series User s Guide...
Страница 363: ......