Completing the installation
After you connect the cables to the modules and route the cables (if necessary, see
the
Rack Installation Instructions
for information about routing the cables), start the
BladeCenter unit (if it is not already started) and verify that it is working properly, as
follows:
1. Start the BladeCenter unit by connecting the power-module power cords to a
220-volt power source (a 220-volt power distribution unit (PDU) that is
connected to a 220-volt ac power outlet).
2. Make sure the LEDs on the modules indicate that they are operating properly.
Verify that:
v
The dc power LED and the ac power LED on each power module are lit.
v
The OK LED on each management module is lit.
v
The OK LED on each switch module is lit.
3. Make sure the Power-on LED on each blade server is lit, either steady or
blinking.
See Chapter 3, “BladeCenter unit power, controls, and indicators”, on page 29 for
information about starting the BladeCenter unit and the location of the LEDs on the
modules. See the
BladeCenter HS20 Type 8678 Installation and User’s Guide
on
the
BladeCenter Documentation
CD for the location of the LEDs on the blade
servers.
Input/output connectors
The BladeCenter unit has the following ports:
v
One video
v
One PS/2 keyboard
v
One PS/2 mouse
v
One Universal Serial Bus (USB) on the front of the BladeCenter unit
v
One 10/100 Mbps Ethernet for remote console and management
v
Four 10/100/1000 Mbps Ethernet on the Ethernet switch module that is required
for the BladeCenter unit
The following illustration shows the I/O connectors on the rear of your BladeCenter.
AC
AC
DC
DC
Switch
module
Ethernet
Remote
management
and console
(Ethernet)
Video
Keyboard
Mouse
AC power
(220 volts)
26
BladeCenter Type 8677: Installation and User’s Guide
Содержание eServer BladeCenter 8677
Страница 3: ...BladeCenter Type 8677 Installation and User s Guide ERserver...
Страница 8: ...vi BladeCenter Type 8677 Installation and User s Guide...
Страница 28: ...12 BladeCenter Type 8677 Installation and User s Guide...
Страница 54: ...38 BladeCenter Type 8677 Installation and User s Guide...
Страница 96: ...80 BladeCenter Type 8677 Installation and User s Guide...
Страница 106: ......
Страница 107: ......
Страница 108: ...IBM Part Number 59P6546 Printed in the United States of America 59P6546...