Unpacking the shipping box

Important:

Do not remove the storage enclosure from the shipping box until the support rails are
installed in the rack cabinet. You must install the support rails in the rack cabinet before you
install the storage enclosure.

The disk drive modules (DDMs) that come with the storage enclosure are packaged in a smaller box
inside the shipping box. To unpack the shipping box, complete the following steps:

1.

Remove the following items from the shipping box. Do not remove the DCS3700 storage subsystem or
DCS3700 storage subsystem with Performance Module Controllers from the shipping box at this time.

v

Six full or empty boxes of DDMs

Note:

The DDMs are packaged ten per box. The minimum order is 20 DDMs, so at least two of the
boxes are full. If you ordered less than the maximum number of 60 DDMs, one or more of
the boxes are empty.

v

Box containing the mounting hardware kit

v

Box containing storage enclosure handles

v

Box containing the power cords and documentation

2.

Check the items in the preceding list to ensure that you received all the necessary parts. See the
“Inventory list” on page 6 for the parts that are included with the storage enclosure.

5

Содержание DCS3700

Страница 1: ...installation of the storage enclosure involves the following procedures 1 Installation guidelines 2 Ordering the lift tool on page 4 3 Unpacking the shipping box on page 5 4 Installing the support ra...

Страница 2: ...grounded outlet The storage enclosure accepts only 200 V 240 V input sources If you do not have an IBM rack with the supported PDUs and 60 A power cords check your PDUs or input sources to ensure that...

Страница 3: ...00 Storage Subsystem and DCS3700 Storage Subsystem with Performance Module Controllers Installation User s and Maintenance Guide for additional information 2 Before you move or relocate a rack that co...

Страница 4: ...employees with access to the IBM intranet For the SSR branch and territory the United States cannot order the lift tool through the parts ordering system UPS Logistics is used to ship and return the l...

Страница 5: ...ve the DCS3700 storage subsystem or DCS3700 storage subsystem with Performance Module Controllers from the shipping box at this time v Six full or empty boxes of DDMs Note The DDMs are packaged ten pe...

Страница 6: ...ule Controllers your shipping box might contain additional materials that are not shown in the following illustration Support rails Storage enclosure M5 x 8 mm screws 16 PDU jumper cord Rear brackets...

Страница 7: ...he DCS3700 storage subsystem or DCS3700 storage subsystem with Performance Module Controllers do not ship with region specific ac power cords You must obtain the IBM approved power cords for your regi...

Страница 8: ...rmance Module Controllers 1 Ensure that the rack has already been installed 2 Ensure that a stabilizer has been attached correctly to the bottom front of the rack to prevent the rack from tipping forw...

Страница 9: ...t insert two M5 screws with washers through the rear of the cabinet and screw them into the support rail rear flange 9 Tighten the two rail adjustment screws with a medium flat blade screwdriver 10 Re...

Страница 10: ...om of the handle in the opening in the storage enclosure chassis and push the handle in and up until the latch at the top of the handle secures the handle to the chassis 3 Repeat step 2 for the three...

Страница 11: ...imum of two trained service technicians are required to push the enclosure out of its custom designed package and onto the lift tool If a lift tool is not available see Appendix E Component weights in...

Страница 12: ...en all of the M5 screws to secure the rear of the storage enclosure to the rack cabinet 8 Turn the rear bracket thumbscrews to attach the rear brackets to the sides of the storage enclosure The screw...

Страница 13: ...subsystem and DCS3700 storage subsystem with Performance Module Controllers but the DDMs are shipped separately from the drive drawers 2 Ensure that you install the storage enclosure in the rack cabin...

Страница 14: ...DMs in the front row of the drive drawer 6 Push the drive drawer into the storage enclosure until it clicks and close the levers on each side of the drawer Attention Ensure you push both levers back a...

Страница 15: ...u do not have an IBM rack with the supported PDUs and 60 A power cords check your PDUs or input sources to ensure that they can handle the DCS3700 or DCS3700 storage subsystem with Performance Module...

Страница 16: ...workstation and locate the applicable directory for your operating system Note The type of operating system that the management station runs is the directory that you must locate on the DS Storage Ma...

Страница 17: ...ler A is 192 168 128 101 v Port 2 on controller A is 192 168 129 101 v Port 1 on controller B is 192 168 128 102 v Port 2 on controller B is 192 168 129 102 v The subnet mask for both Ethernet ports i...

Страница 18: ...tion and click Continue Note For detailed information about device driver and firmware versions ensure that you read the readme files that are posted with each package Updating the storage subsystem f...

Страница 19: ...1U 0U 0U Rail assembly front left Rail assembly front right FRONT Rack Mounting Template 4U 4U Install second Install first Install second Install first Install first Install first Install second Ins...

Страница 20: ...3U 3U 2U 2U 1U 1U 0U 0U Rail assembly rear left Rail assembly rear right Printed in the U S A REAR Rack Mounting Template Rail mounting guide 4U 4U Rear bracket Rear bracket 20...

Страница 21: ...ed States other countries or both Microsoft and Windows are trademarks of Microsoft Corporation in the United States other countries or both Copyright IBM Corporation 2012 US Government Users Restrict...

Отзывы: