5. Use the M6 washers, screws, and clip nuts to attach the filler plate to the rear
mounting brackets. Torque the screws to approximately 5.7 Nm +/- 0.1 Nm (50
inch-pounds).
4
2
6
8
6. Use the M3.5 screws to secure the rear brackets to the front brackets. Torque
the screws to approximately 2.0 Nm +/- 0.1 Nm (17.7 inch-pounds).
9
10 11
3
7. Connect all the cables.
8. Initialize the switch, see Chapter 4, “Initializing the RackSwitch,” on page 43.
Attention:
If this is a switch replacement, make sure that the vital product
data (VPD) is updated to avoid losing the licensed electronic entitlement data of
the RackSwitch. For more information, see “Configuring Vital Product Data after
a switch replacement” on page 41.
Chapter 2. Installing the RackSwitch and options
27
Содержание BNT RackSwitch G8124
Страница 1: ...IBM System Networking RackSwitch G8124 and G8124 E Installation Guide...
Страница 2: ......
Страница 3: ...IBM System Networking RackSwitch G8124 and G8124 E Installation Guide...
Страница 7: ...DANGER Rack mounted devices are not to be used as shelves or work spaces L002 Safety v...
Страница 9: ...Safety vii...
Страница 14: ...xii IBM System Networking RackSwitch G8124 and G8124 E Installation Guide...
Страница 64: ...48 IBM System Networking RackSwitch G8124 and G8124 E Installation Guide...
Страница 72: ...56 IBM System Networking RackSwitch G8124 and G8124 E Installation Guide...
Страница 76: ...60 IBM System Networking RackSwitch G8124 and G8124 E Installation Guide...
Страница 84: ...68 IBM System Networking RackSwitch G8124 and G8124 E Installation Guide...
Страница 87: ......
Страница 88: ...Part Number 00AY390 Printed in USA 1P P N 00AY390...