6. Connect all cables.
7. Initialize the switch, see Chapter 4, “Initializing the RackSwitch,” on page 43.
Attention:
If this is a switch replacement, make sure the VPD is updated to
avoid losing the licensed electronic entitlement data of the RackSwitch. For
more information, see “Configuring Vital Product Data after a switch
replacement” on page 41.
Chapter 2. Installing the RackSwitch and options
23
Содержание BNT RackSwitch G8124
Страница 1: ...IBM System Networking RackSwitch G8124 and G8124 E Installation Guide...
Страница 2: ......
Страница 3: ...IBM System Networking RackSwitch G8124 and G8124 E Installation Guide...
Страница 7: ...DANGER Rack mounted devices are not to be used as shelves or work spaces L002 Safety v...
Страница 9: ...Safety vii...
Страница 14: ...xii IBM System Networking RackSwitch G8124 and G8124 E Installation Guide...
Страница 64: ...48 IBM System Networking RackSwitch G8124 and G8124 E Installation Guide...
Страница 72: ...56 IBM System Networking RackSwitch G8124 and G8124 E Installation Guide...
Страница 76: ...60 IBM System Networking RackSwitch G8124 and G8124 E Installation Guide...
Страница 84: ...68 IBM System Networking RackSwitch G8124 and G8124 E Installation Guide...
Страница 87: ......
Страница 88: ...Part Number 00AY390 Printed in USA 1P P N 00AY390...