Chapter 2. Installing and removing a copper pass-thru
module
Figure 3 shows the BladeCenter I/O-module bay locations.
AC
AC
DC
DC
I/O-module
bay 3
I/O-module bay 1
I/O-module bay 4
I/O-module bay 2
Attention:
To maintain proper system cooling and performance, each module
bay must contain either a module or a filler module; each blade bay must
contain either a blade server, expansion unit, or a filler blade.
Figure 4 on page 8 shows the BladeCenter T I/O module locations.
Figure 3. BladeCenter I/O module bay locations
© Copyright IBM Corp. 2012
7
Содержание BladeCenter Copper Pass-thru
Страница 1: ...IBM BladeCenter Copper Pass thru Module Installation Guide...
Страница 2: ......
Страница 3: ...IBM BladeCenter Copper Pass thru Module Installation Guide...
Страница 14: ...xii IBM BladeCenter Copper Pass thru Module Installation Guide...
Страница 36: ...22 IBM BladeCenter Copper Pass thru Module Installation Guide...
Страница 55: ......
Страница 56: ...Part Number 25R4622 02 Printed in USA...