11.
Make sure that the LEDs on the copper pass-thru module indicate that it
is operating properly. (See “Information LEDs” on page 25 for LED
locations.) Make sure that:
v
The green power LED is lit.
v
The amber copper pass-thru module error LED is not lit.
v
The LINK OK LED is lit.
If LED conditions are not as specified, see “Troubleshooting” on page 29.
12.
If you have other modules to install, do so now; otherwise, go to step 13.
13.
Attach any cables required by the copper pass-thru module. See Chapter 4,
“Completing the installation,” on page 27 for instructions. For the location
of the connectors on the BladeCenter unit, see the
Installation and User’s
Guide
for your BladeCenter unit on the BladeCenter unit
Documentation
CD.
14.
Replace the acoustic-attenuation module, if you removed it in step 3 on
page 18.
15.
Make sure that the ports on the copper pass-thru module are enabled (
I/O
Module Tasks > Management > Advanced Management
in the
management module Web-based interface).
Chapter 2. Installing and removing a copper pass-thru module
19
Содержание BladeCenter Copper Pass-thru
Страница 1: ...IBM BladeCenter Copper Pass thru Module Installation Guide...
Страница 2: ......
Страница 3: ...IBM BladeCenter Copper Pass thru Module Installation Guide...
Страница 14: ...xii IBM BladeCenter Copper Pass thru Module Installation Guide...
Страница 36: ...22 IBM BladeCenter Copper Pass thru Module Installation Guide...
Страница 55: ......
Страница 56: ...Part Number 25R4622 02 Printed in USA...