Connecting the SPCN and optical cables to the AS/400e system 620 or
server S20
To connect the SPCN cable and the optical cable to your system unit, follow these
steps:
__ 1.
Plug the SPCN cable into the SPCN connector on your system unit.
__ 2.
Tighten the thumbscrews.
Refer to Figure 32 on page 32 and install your optical cables:
__ 1.
Locate the optical card connector inside of your system unit.
__ 2.
On the back of the system unit, loosen two screws and open the cover plate.
__ 3.
Route the optical cable to the optical connector through the back of your
system unit.
__ 4.
Remove the two protective plugs from the 2688 OLP card.
__ 5.
Push the optical cable that is labeled
0
into the OLP cable connector on the
left.
__ 6.
Push the optical cable that is labeled
1
into the OLP cable connector on the
right.
__ 7.
Go to “Replacing the covers on your AS/400e system 620 or server S20” on
page 32
Figure 31. Removing system unit access cover
Appendix A. Connecting cables to your AS400e System 620 or S20
31
Содержание AS/400e
Страница 1: ...AS 400e Setting Up Your 5065 or 5066 Expansion Unit V ersion 4 SA41 5146 01...
Страница 2: ......
Страница 3: ...AS 400e Setting Up Your 5065 or 5066 Expansion Unit V ersion 4 SA41 5146 01...
Страница 6: ...iv Setting Up Your 5065 or 5066 Expansion Unit V4R5...
Страница 10: ...viii Setting Up Your 5065 or 5066 Expansion Unit V4R5...
Страница 28: ...16 Setting Up Your 5065 or 5066 Expansion Unit V4R5...
Страница 30: ...Figure 19 Opening the 5066 rear cover 18 Setting Up Your 5065 or 5066 Expansion Unit V4R5...
Страница 36: ...24 Setting Up Your 5065 or 5066 Expansion Unit V4R5...
Страница 46: ...34 Setting Up Your 5065 or 5066 Expansion Unit V4R5...
Страница 80: ...68 Setting Up Your 5065 or 5066 Expansion Unit V4R5...
Страница 83: ......
Страница 85: ...Spine information AS 400e Setting Up Your 5065 or 5066 Expansion Unit V4R5 Version 4...