
16.
On your system unit, install one end of an SPCN cable into an available SPCN
connector. The SPCN connector is labeled J15 or J16.
17.
Tighten the thumbscrews.
18.
On unit 5066–002, connect the other end of the SPCN cable to the SPCN
connector that is labeled J15.
19.
Tighten the thumbscrews.
20.
On unit 5066-002, connect another SPCN cable to the SPCN connector that is
labeled J16.
21.
Tighten the thumbscrews.
22.
On unit 5066-001, connect the other end of the second SPCN cable to the
SPCN connector that is labeled J15.
23.
Tighten the thumbscrews.
24.
On your 5066 connect a power cable to each power connector.
25.
Go to “Chapter 4. Completing your installation” on page 23.
22
Setting Up Your 5065 or 5066 Expansion Unit V4R5
Содержание AS/400e
Страница 1: ...AS 400e Setting Up Your 5065 or 5066 Expansion Unit V ersion 4 SA41 5146 01...
Страница 2: ......
Страница 3: ...AS 400e Setting Up Your 5065 or 5066 Expansion Unit V ersion 4 SA41 5146 01...
Страница 6: ...iv Setting Up Your 5065 or 5066 Expansion Unit V4R5...
Страница 10: ...viii Setting Up Your 5065 or 5066 Expansion Unit V4R5...
Страница 28: ...16 Setting Up Your 5065 or 5066 Expansion Unit V4R5...
Страница 30: ...Figure 19 Opening the 5066 rear cover 18 Setting Up Your 5065 or 5066 Expansion Unit V4R5...
Страница 36: ...24 Setting Up Your 5065 or 5066 Expansion Unit V4R5...
Страница 46: ...34 Setting Up Your 5065 or 5066 Expansion Unit V4R5...
Страница 80: ...68 Setting Up Your 5065 or 5066 Expansion Unit V4R5...
Страница 83: ......
Страница 85: ...Spine information AS 400e Setting Up Your 5065 or 5066 Expansion Unit V4R5 Version 4...