v
Never assume that power has been disconnected from a circuit. Check it to
make sure that it has been disconnected.
v
If you have to work on equipment that has exposed electrical circuits, observe
the following precautions:
– Make sure that another person who is familiar with the power-off controls is
near you and is available to turn off the power if necessary.
– When you work with powered-on electrical equipment, use only one hand.
Keep the other hand in your pocket or behind your back to avoid creating a
complete circuit that could cause an electrical shock.
– When you use a tester, set the controls correctly and use the approved probe
leads and accessories for that tester.
– Stand on a suitable rubber mat to insulate you from grounds such as metal
floor strips and equipment frames.
v
Use extreme care when you measure high voltages.
v
To ensure proper grounding of components such as power supplies, pumps,
blowers, fans, and motor generators, do not service these components outside of
their normal operating locations.
v
If an electrical accident occurs, use caution, turn off the power, and send another
person to get medical aid.
Safety statements
These statements provide the caution and danger information that is used in this
documentation.
Important:
Each caution and danger statement in this documentation is labeled with a
number. This number is used to cross reference an English-language caution or
danger statement with translated versions of the caution or danger statement in
the
Safety Information
document.
For example, if a danger statement is labeled
D005
, translations for that caution
statement are in the
Safety Information
document under
D005
.
Be sure to read all caution and danger statements in this documentation before you
perform the procedures. Read any additional safety information that comes with
your system or optional device before you install the device.
viii
Installation and User's Guide
Содержание 5594-1AX
Страница 1: ...IBM 2U Rack or Tower UPS RT1 5kVA RT2 2kVA and RT3 0kVA Installation and User s Guide...
Страница 2: ......
Страница 3: ...IBM 2U Rack or Tower UPS RT1 5kVA RT2 2kVA and RT3 0kVA Installation and User s Guide...
Страница 6: ...iv Installation and User s Guide...
Страница 20: ...4 Installation and User s Guide...
Страница 34: ...18 Installation and User s Guide...
Страница 42: ...Figure 15 Installing one EBM tower Figure 16 Installing four EBMs tower 26 Installation and User s Guide...
Страница 52: ...36 Installation and User s Guide...
Страница 58: ...42 Installation and User s Guide...
Страница 62: ...46 Installation and User s Guide...
Страница 69: ...Taiwan Class A compliance statement Appendix C Notices 53...
Страница 70: ...54 Installation and User s Guide...
Страница 72: ...56 Installation and User s Guide...
Страница 73: ......
Страница 74: ...Part Number 47C9191 Printed in USA 1P P N 47C9191...