background image

17

 

7500/10000XHV models only:

 

Connect the serial cable to the serial port on the back of the uninterruptible power supply. 

When using PowerChute

®

 Network Shutdown software: 

1.

 

Exit the PowerChute Business Edition agent and server using the following steps: 

a.   From the desktop, click 

Start

=> 

Settings

=> 

Control Panel

=> 

Administrative Tools

=> 

Services

b.   Select 

PCBE Server and PCBE Agent

; then, right click the mouse and select 

Stop

2.

 

Open a terminal program, for example HyperTerminal. 

From the desktop, click 

Start

 => 

Programs

 => 

Accessories

 => 

Communication

 =>

HyperTerminal.

  

3.

 

Double-click on the 

HyperTerminal

 icon.  

a.   Follow the prompts to choose a name and select an icon. Disregard the message, 

must install a modem

, if it is displayed. Click 

OK

b.   Select the 

COM

 port that is connected to your uninterruptible power supply. The port settings are: 

9

 

bits per second - 2400

 

9

 

data - bits 8

 

9

 

parity - none

 

9

 

stop bit - 1

 

9

 

flow control - none

 

        c.   Click Enter. 

4.

 

To set the number of external battery packs (IBM 3U Extend Run Battery Packs): 

a.   Press Enter to initiate terminal mode. Press Enter multiple times, until the 

User Name 

prompt

 

is displayed. Follow the 

prompts. Type slowly, waiting until each character is displayed on the screen before typing the next character. 

Network Management Card defaults: 

 

User Name:  

apc

 

 

Password:     

apc

 

b.   Press 1 and Enter to select 

Device Manager

        Select the model by entering the corresponding number, then press Enter. 

c.   Press 3 and Enter to select 

Configuration

d.   Press 1 and Enter to select 

Battery

e.   Press 2 and Enter to change the 

Battery Settings

Type in the number of external battery packs (four battery modules per pack), then press Enter. (Number of packs: 1= internal 
battery module, 2 = 1 IBM 3U Extend Run Battery Pack, 3 = 2 IBM 3U Extend Run Battery Packs, etc.) 

f.   Press 3 and Enter to 

Accept Changes

g.   Press Esc multiple times to return to the main menu. 

h.   Press 4 and Enter to log out.

 

 

 

 

 

Содержание 3U Extend Run

Страница 1: ...IBM 3U Extend Run Battery Pack Operation and Setup Guide 46M5390...

Страница 2: ...ce 18 5 GETTING HELP AND TECHNICAL ASSISTANCE 19 Before you call 19 Using the documentation 19 Getting help and information from the World Wide Web 19 Software service and support 20 Hardware service...

Страница 3: ...r dette produkt Lees voordat u dit product installeert eerst de veiligheidsvoorschriften Ennen kuin asennat t m n tuotteen lue turvaohjeet kohdasta Safety Information Avant d installer ce produit lise...

Страница 4: ...ution statement is labeled D005 translations for that caution statement are in the Systems Safety Notices document under D005 Be sure to read all caution and danger statements in this document before...

Страница 5: ...ing plate Connect any equipment that will be attached to this product to properly wired outlets When possible use one hand only to connect or disconnect signal cables Never turn on any equipment when...

Страница 6: ...moving the UPS from the shipping carton or installing or removing the UPS in the rack D007 CAUTION Energy hazard present Shorting might result in system outage and possible physical injury Remove all...

Страница 7: ...on and Setup Guide for battery replacement and service information Attention Read the Safety Instructions before installing the battery pack The uninterruptible power supply and battery modules are he...

Страница 8: ...s Operating 3 000 m 10 000 ft Maximum Elevation Storage 15 000 m 50 000 ft Humidity 0 to 95 relative humidity This unit is intended for indoor use only Select a location sturdy enough to handle the we...

Страница 9: ...e battery packs must be mounted below the uninterruptible power supply Z Secure the uninterruptible power supply in the rack using four Phillips hex screws Connecting the Extend Run Battery Packs to t...

Страница 10: ...tery pack connectors on the rear panel of the uninterruptible power supply and the extend run battery pack IBM7500 10000XHV NOTE The connectors on the 7500 1000XHV models are color coded and keyed to...

Страница 11: ...nnectors on the rear panel of the uninterruptible power supply and the extend run battery pack IBM7500 10000XHV NOTE The connectors on the 7500 1000XHV models are color coded and keyed to ensure prope...

Страница 12: ...nd Attaching the Bezel X Reinstall all of the battery modules Y Connect all of the battery modules Secure the battery compartment door using all nine screws Be sure the battery cables are positioned s...

Страница 13: ...ving the Battery Modules in this manual Note The external battery packs must be installed to the right of the uninterruptible power supply when facing the front of the units X Remove the rail guides Y...

Страница 14: ...Connect the ground wire to the TVSS GND screw as shown in the diagrams below For multiple battery packs connect the wire to the TVSS screw on the nearest battery pack Locate the battery pack connecto...

Страница 15: ...e Bezel X Reinstall all battery modules Install the bottom battery module first Y Connect all of the battery modules Z Secure the battery compartment door using all nine screws Be sure the battery cab...

Страница 16: ...00XHV model Number of Battery Packs Load W Internal 1 2 4 50 6 49 18 03 31 32 59 56 100 4 50 12 51 22 29 42 46 200 3 00 8 03 14 06 26 50 300 2 09 5 47 10 10 19 22 400 1 39 4 30 7 54 15 04 500 1 20 3 3...

Страница 17: ...1 5000 0 10 0 21 0 35 1 03 6000 0 07 0 16 0 28 0 52 Recharge Hours 3 7 10 17 10000XHV model Number of Battery Packs Load W Internal 1 2 4 50 7 33 13 49 21 33 37 40 100 6 00 10 55 17 03 29 49 200 4 09...

Страница 18: ...ninterruptible power supply chassis Carefully remove the NMC 3 Open a terminal program for example HyperTerminal From the desktop click Start Programs Accessories Communication HyperTerminal 4 Double...

Страница 19: ...d 2400 9 data bits 8 9 parity none 9 stop bit 1 9 flow control none c Click Enter 4 To set the number of external battery packs IBM 3U Extend Run Battery Packs a Press Enter to initiate terminal mode...

Страница 20: ...the problems discussed in Troubleshooting to eliminate common problems 2 If the problem persists contact IBM Note the model number of the uninterruptible power supply the serial number and the date pu...

Страница 21: ...erating systems and programs come with documentation that contains troubleshooting procedures and explanations of error messages and error codes If you suspect a software problem see the documentation...

Страница 22: ...call 1 800 IBM SERV 1 800 426 7378 HARDWARE SERVICE AND SUPPORT You can receive hardware service through your IBM reseller or IBM Services To locate a reseller authorized by IBM to provide warranty s...

Страница 23: ...F ANY KIND EITHER EXPRESS OR IMPLIED INCLUDING BUT NOT LIMITED TO THE IMPLIED WARRANTIES OF NON INFRINGEMENT MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE Some states do not allow disclaimer of...

Страница 24: ...Open Group in the United States and other countries Other company product or service names may be trademarks or service marks of others IMPORTANT NOTES Processor speeds indicate the internal clock sp...

Страница 25: ...r replacement of devices or parts on implementation of appropriate remedial measures to mitigate such environmental contamination Implementation of such remedial measures is a customer responsibility...

Страница 26: ...ICES 003 Avis de conformit la r glementation d Industrie Canada Cet appareil num rique de la classe A est conforme la norme NMB 003 du Canada Australia and New Zealand Class A statement Attention Thi...

Страница 27: ...rden EN 55022 Klasse A Ger te m ssen mit folgendem Warnhinweis versehen werden Warnung Dieses ist eine Einrichtung der Klasse A Diese Einrichtung kann im Wohnbereich Funk St rungen verursachen in dies...

Страница 28: ...26 People s Republic of China Class A warning statement Japanese Voluntary Control Council for Interference VCCI statement Korean Class A warning statement...

Отзывы: