© Copyright IBM Corporation 2019, 2020. Customer Install Guide, 1G Switch
31
ALL OPEN RACK BAYS REQUIRE FILLERS TO PREVENT HOT AIR FROM
RECIRCULATING TO THE FRONT OF THE RACK AND INTO THE COLD
AIR INLETS.
DO NOT BLOCK ANY INLET OR EXHAUST DUCTS, VENTS OR PORTS
KEEP ALL POWER CORDS, SIGNAL CABLES AND TRANSCEIVERS WITH
THE INSTALLED CHASSIS FOR USE BY IBM INSTALLERS.
DO NOT POWER-ON THIS CHASSIS. POWER ON WILL BE DONE BY
YOUR IBM INSTALLATION TEAM.
Содержание 3454-A3C
Страница 24: ...Copyright IBM Corporation 2019 2020 Customer Install Guide 1G Switch 24...
Страница 25: ...Copyright IBM Corporation 2019 2020 Customer Install Guide 1G Switch 25...
Страница 26: ...Copyright IBM Corporation 2019 2020 Customer Install Guide 1G Switch 26...
Страница 33: ...Copyright IBM Corporation 2019 2020 Customer Install Guide 1G Switch 33...
Страница 34: ...Copyright IBM Corporation 2019 2020 Customer Install Guide 1G Switch 34...
Страница 35: ...Copyright IBM Corporation 2019 2020 Customer Install Guide 1G Switch 35...
Страница 37: ...Copyright IBM Corporation 2019 2020 Customer Install Guide 1G Switch 37...
Страница 44: ...Copyright IBM Corporation 2019 2020 Customer Install Guide 1G Switch 44 Regulatory and Compliance...
Страница 51: ...Copyright IBM Corporation 2019 2020 Customer Install Guide 1G Switch 51...
Страница 52: ...Copyright IBM Corporation 2019 2020 Customer Install Guide 1G Switch 52 Part Number 02JE404 Printed in Mexico...