© Copyright IBM Corporation 2019, 2020. Customer Install Guide, 1G Switch
27
Step 7
For stacked installation of adjacent switch assemblies in a rack, the duct kits need to
have their screw-in floors removed.
Remove the floor by unscrewing the four screws
on each side of the duct rail.
STEP 8
Convert side rail from storage position to overlap position by removing the (3)
screws on the side blocking plate and reinstalling them in the lower three holes to
extend below the lower edge of the rail. (2 pls). This will block excess hot air
from entering between the switch rails.
Move (3) screws down to
bottom holes to lower
blocking plate (both sides)
Содержание 3454-A3C
Страница 24: ...Copyright IBM Corporation 2019 2020 Customer Install Guide 1G Switch 24...
Страница 25: ...Copyright IBM Corporation 2019 2020 Customer Install Guide 1G Switch 25...
Страница 26: ...Copyright IBM Corporation 2019 2020 Customer Install Guide 1G Switch 26...
Страница 33: ...Copyright IBM Corporation 2019 2020 Customer Install Guide 1G Switch 33...
Страница 34: ...Copyright IBM Corporation 2019 2020 Customer Install Guide 1G Switch 34...
Страница 35: ...Copyright IBM Corporation 2019 2020 Customer Install Guide 1G Switch 35...
Страница 37: ...Copyright IBM Corporation 2019 2020 Customer Install Guide 1G Switch 37...
Страница 44: ...Copyright IBM Corporation 2019 2020 Customer Install Guide 1G Switch 44 Regulatory and Compliance...
Страница 51: ...Copyright IBM Corporation 2019 2020 Customer Install Guide 1G Switch 51...
Страница 52: ...Copyright IBM Corporation 2019 2020 Customer Install Guide 1G Switch 52 Part Number 02JE404 Printed in Mexico...