background image

Customer-replaceable units (CRUs)

Table 11. Part numbers of Customer-replaceable units
Part #

Substitute Part

Part Desc

001GY673

PWR CABLE

001JC682

FAN

001ML987

EXPANDER

001JC683

EBOD 6G

000LY451

800GB SSD
2800W PSU

001JC681

002PX823

2800W PSU

000LY450

8TB HDD

000LY449

4TB HDD

001LU840

14TB HDD

000LY453

10TB HDD

General procedures

General procedures include opening and closing drive drawers.

Opening a drawer

1. Make sure the anti-tamper locks are not engaged. The red arrows on the locks will point inwards if the

locks are disengaged (see the following figure). Unlock them if necessary by rotating them

counterclockwise using a screwdriver with a Torx T20 bit.

Figure 27. Anti-tamper locks (shown disengaged)

2. Push the drawer latches inward and hold them (see the following figure).

38  IBM ESS expansion: Installation and User Guide - Model 084

Содержание 084

Страница 1: ...IBM ESS expansion Version 5 3 5 Installation and User Guide Model 084 IBM SC27462802...

Страница 2: ...al notices on page ix The information in the IBM Environmental Notices and User Guide provided on a DVD This edition applies to IBM ESS expansion Model 084 and is valid until replaced by new editions...

Страница 3: ...recautions 7 Regional safety 7 Chapter 2 System overview 9 Chassis 9 The enclosure core product 10 Enclosure Chassis 11 Power supply unit PSU 15 Cooling module 15 SBB I O module 16 Enclosure managemen...

Страница 4: ...Safety 54 Environmental and Recycling 54 Acoustics 55 AC power cords 56 Potential for radio frequency interference 56 Notices 57 Trademarks 58 Electronic emission notices 58 Federal Communications Co...

Страница 5: ...Ds left side only 12 9 A disk drive in carrier DDIC 12 10 Enclosure operator s panel 14 11 2800W PSU 15 12 PSU LEDs 15 13 Cooling module 16 14 6Gb s SAS EBOD module 17 15 Unpacking the system 20 16 Mo...

Страница 6: ...ve location plan 40 31 Removing a DDIC 41 32 Installing a DDIC 41 33 Latch position of a correctly inserted drive 41 34 Cooling module LEDs 42 35 Removing a Cooling Module 1 42 36 Removing a Cooling M...

Страница 7: ...b s SAS EBOD I O Module LED Descriptions 34 9 Alarm Conditions 34 10 Part numbers of Field replaceable units 37 11 Part numbers of Customer replaceable units 38 12 Enclosure dimensions 49 13 Component...

Страница 8: ...viii...

Страница 9: ...ed the power cord s connect power to this unit only with the IBM provided power cord Do not use the IBM provided power cord for any other product Do not open or service any power supply assembly Do no...

Страница 10: ...C 212 F repair or disassemble C003 Use the following general safety information for all rack mounted devices DANGER Observe the following precautions when working on or around your IT rack system Heav...

Страница 11: ...nt of the supply circuit For sliding drawers Do not pull out or install any drawer or feature if the rack stabilizer brackets are not attached to the rack Do not pull out more than one drawer at a tim...

Страница 12: ...of the required environmental notices for IBM Systems products in English and other languages The IBM Systems Environmental Notices information includes statements on limitations product information p...

Страница 13: ...thod of contacting the IBM Support Center In the United States Call 1 800 IBM SERV for support Outside the United States Contact your local IBM Support Center or see the Directory of worldwide contact...

Страница 14: ...xiv IBM ESS expansion Installation and User Guide Model 084...

Страница 15: ...ent Damage If you think the equipment is damaged in any way remove all external cords and cables and contact your equipment supplier Handling CAUTION A fully configured enclosure weighs up to 135kg 29...

Страница 16: ...of three people to lift the enclosure CAUTION A fully configured enclosure weighs up to 135kg 298lb An unpopulated enclosure weighs 46kg 101lb Use appropriate lifting methods The packaging includes li...

Страница 17: ...when they are in a storage area or in transit See the individual server specifications for operating environment limits Shipment of large processors should be in an environmentally controlled van with...

Страница 18: ...To prevent overturning drawer interlocks stop users from opening both drawers at the same time Do not attempt to force open a drawer when the other drawer in the enclosure is already open In a rack c...

Страница 19: ...round of the enclosure before you switch on the power supply Important The enclosure must be grounded before applying power The plug on the power supply cord is used as the main disconnect device Ensu...

Страница 20: ...m the top down CAUTION The enclosure must be mounted into a rack using the supplied rail kit only Due to its weight and length the enclosure must not be flange mounted Before mounting the enclosure re...

Страница 21: ...rge ESD precautions Fit and check a suitable anti static wrist or ankle strap and observe all conventional ESD precautions when handling plug in modules and components Avoid contact with backplane com...

Страница 22: ...8 IBM ESS expansion Installation and User Guide Model 084...

Страница 23: ...m uses 3 5 or 2 5 SAS drives 2 5 drives require a 3 5 adapter Each drive is hotpluggable and can be replaced on site This enclosure is designed for high availability with no single point of failure fo...

Страница 24: ...el A midplane PCB into which other components connect Two Power Supply Units PSUs Five cooling modules Two SBB I O modules Up to 84 Disk Drive In Carrier DDIC modules with drives installed A rail kit...

Страница 25: ...rupt the functioning of the system and DDICs can be hotswapped while the enclosure continues to operate However drawers must not be left open for longer than 10 minutes otherwise airflow and cooling w...

Страница 26: ...cooling Disk drives in carriers DDICs Each drive is housed in a carrier see the following figure that enables secure insertion of the drive into the drawer and contains the appropriate transition card...

Страница 27: ...Scale RAID Administration The drive carrier has a single amber LED which is lit when the drive has a fault Operator s panel The front of the enclosure features an operator s ops panel shown in Figure...

Страница 28: ...er Power On Standby LED green amber Shows amber when the system is in standby not operational Shows green when the system is on operational Module Fault LED amber Shows amber when there is a system ha...

Страница 29: ...of the defective PSU Ensure you have a replacement PSU before you remove the defective PSU For the replacement procedure see Replacing a power supply unit PSU on page 43 The enclosure chassis is keyed...

Страница 30: ...aust installation Back pressure created by the rack doors and obstacles is not to exceed 5 pascals 0 5mm water gauge The cooling system provides sufficient capacity to ensure that maximum temperatures...

Страница 31: ...he power is switched on The enclosure will not power up if there are no I O modules present An alarm occurs when incompatible configurations are detected The enclosure chassis is keyed to prevent I O...

Страница 32: ...18 IBM ESS expansion Installation and User Guide Model 084...

Страница 33: ...orrect software Before setting up your enclosure ensure ESS I O server nodes have the SAS HBA installed in the correct slot Ensure that you have the following equipment Mini SAS to mini SAS HD cable P...

Страница 34: ...ost to the inside of the rear post is 660mm 840mm This suits a one meter deep rack within Rack Specification IEC 60297 1 To facilitate access remove the door from the rack 2 Ensure the pre assembled r...

Страница 35: ...he rear enclosure fixing screws x2 Note Use the long or short hold down bracket depending on the distance from the rack post to the enclosure hold down slot Ensure the sliding nut is at the rear of th...

Страница 36: ...he rack the straps are not suitable for removing the enclosure from the rack Inserting modules See the Chapter 6 Module replacement on page 37 chapter for the following instructions Inserting a coolin...

Страница 37: ...preserve data security Power down your host computer and all attached peripheral devices before beginning installation Each enclosure contains up to 84 removable disk drive modules Disk drives are fra...

Страница 38: ...24 IBM ESS expansion Installation and User Guide Model 084...

Страница 39: ...ould be lit green and the disk drive motors should start Important If mains power is lost for any reason the system restarts automatically when power is restored Note For details of the ops panel LEDs...

Страница 40: ...identification number The unit identification number is set from the factory In the event the unit identification number is not set the display is set to 00 flashing The enclosure continues to power u...

Страница 41: ...e set via other methods As previously stated the new setting is applied only after a power cycle All other functionality remains the same as described previously Normal Power down To prevent potential...

Страница 42: ...28 IBM ESS expansion Installation and User Guide Model 084...

Страница 43: ...recognize the enclosure Ensure that the enclosure is properly connected See the approved cabling schema in the Cabling the Elastic Storage Server Appendix of Elastic Storage Server Deploying the Elast...

Страница 44: ...tandby other PSU is providing power On On On Enclosure management software has lost communication with the PSU On Off PSU has failed Follow the procedure in Replacing a Power Supply Unit PSU Cooling m...

Страница 45: ...used for other purposes Power On Standby LED Amber if the system is in standby Green if the system has full power Module Fault LED Amber indicates a fault in a PSU cooling module or SBB I O module Ch...

Страница 46: ...e only Table 7 Drawer LED descriptions LED Description Sideplane OK Power Good Green if the sideplane card is working and there are no power problems Drawer Fault Amber if a drawer component has faile...

Страница 47: ...re When lit service action is required for the drive See Elastic Storage Server Spectrum Scale RAID Administration Guide for servicing and replacing the drive Do not remove or replace a drive without...

Страница 48: ...amber color to indicate a fault All alarms will also be reported by SES See Elastic Storage Server Spectrum Scale RAID Administration Guide and the Maintenance Procedures section in Elastic Storage Se...

Страница 49: ...Thermal alarm Symptom Ops panel module fault LED is amber Fan fail LED is lit on one or more cooling modules Cause The internal temperature has exceeded a preset threshold Action 1 Check that the loca...

Страница 50: ...dates Use Spectrum Scale RAID to update firmware For updating enclosure firmware see the Elastic Storage Server Spectrum Scale RAID Administration Guide 36 IBM ESS expansion Installation and User Guid...

Страница 51: ...enclosure Enclosure access and use during this period is uninterrupted If an enclosure contains two PSUs one of them can maintain power to the system while the other is replaced Field replaceable uni...

Страница 52: ...l procedures General procedures include opening and closing drive drawers Opening a drawer 1 Make sure the anti tamper locks are not engaged The red arrows on the locks will point inwards if the locks...

Страница 53: ...ortant The drawer must not be left open for more than two minutes while the enclosure is powered Closing a drawer 1 Press and hold both of the black latches on the sides of the drawer see the followin...

Страница 54: ...contains the drive to be replaced If the drive number is known you can use the plan in the following figure If the drive failed the drive fault LED is lit amber on the relevant drawer Figure 30 Drive...

Страница 55: ...t down while sliding the drive carrier plate in the direction shown in the previous figure This action locks the drive in place 4 Check that the release latch has returned to its locked position as sh...

Страница 56: ...module ensure you have a replacement module to insert 1 Identify the cooling module to be removed If the module has failed the fan fault LED will display an amber color as shown in the following figur...

Страница 57: ...ses the new unit Replacing a power supply unit PSU The process involves removing the existing module and inserting a new one Removing a PSU Important Before removing a PSU make sure you have a replace...

Страница 58: ...38 Removing a PSU Module 2 Important The PSU module bay must not be empty for more than two minutes while the enclosure is powered up Inserting a PSU 1 Ensure the PSU is switched off 44 IBM ESS expans...

Страница 59: ...I O module The process involves removing the existing module and inserting a new one Important Before removing an SBB I O module make sure you have a replacement module to insert Removing an SBB I O m...

Страница 60: ...e shown Figure 41 Removing an I O module 2 4 Pull the module out of the enclosure 2 Important The SBB I O module bay must not be empty for more than two minutes while the enclosure is powered 46 IBM E...

Страница 61: ...O module into its slot until it will go no farther and the handle has started to close 4 Close the latch until it clicks home This levers the module home into its connector on the midplane The enclos...

Страница 62: ...48 IBM ESS expansion Installation and User Guide Model 084...

Страница 63: ...f chassis 36 915 Weights The table shows the weight of the components All weights are approximate Table 13 Component weights Component Pounds Kilograms Fully populated enclosure 298 135 Drive carrier...

Страница 64: ...re range 41 F 5 C to 95 F 35 C 40 F 40 C to 158 F 70 C Relative humidity 20 rh to 80 rh non condensing 5 rh to 100 rh non condensing Maximum wet bulb 82 F 28 C 84 F 29 C Cooling modules Each of the fi...

Страница 65: ...erprise HDD IBM Part number 00LY449 8TB Enterprise HDD IBM Part number 00LY450 10TB Enterprise HDD IBM Part number 00LY453 Solid State Drives SSD 800GB SDD IBM Part number 00LY451 Shock and vibration...

Страница 66: ...52 IBM ESS expansion Installation and User Guide Model 084...

Страница 67: ...2 2015 Class A KN32 2015 and KN35 2015 United States CFR47 Part 15 Radio Frequency Devices Subpart B Unintentional Radiators Class A Class A labeling is used Radiated emission standards Model 084 comp...

Страница 68: ...actured from RoHS compliant materials and components in accordance with EU Directives 2002 95 EC and 2011 65 EU Additionally this enclosure does not contain any substances or materials listed in Annex...

Страница 69: ...d the packaging includes the correct recycling mark China RoHS Declaration EuP Directive The IBM ESS expansion Model 084 enclosure is not yet required to comply with the Environmentally Friendly Desig...

Страница 70: ...is operated in a commercial environment This equipment generates uses and can radiate radio frequency energy and if not installed and used in accordance with the instruction manual may cause harmful i...

Страница 71: ...ACHINES CORPORATION PROVIDES THIS PUBLICATION AS IS WITHOUT WARRANTY OF ANY KIND EITHER EXPRESS OR IMPLIED INCLUDING BUT NOT LIMITED TO THE IMPLIED WARRANTIES OF NON INFRINGEMENT MERCHANTABILITY OR FI...

Страница 72: ...ou may copy modify and distribute these sample programs in any form without payment to IBM for the purposes of developing using marketing or distributing application programs conforming to the applica...

Страница 73: ...duct In a domestic environment this product might cause radio interference in which case the user might be required to take adequate measures European Union Electromagnetic Compatibility Directive Thi...

Страница 74: ...ber die elektromagnetische Vertr glichkeit von Ger ten EMVG bzw der EMC EG Richtlinie 2004 108 EG f r Ger te der Klasse A Dieses Ger t ist berechtigt in bereinstimmung mit dem Deutschen EMVG das EG K...

Страница 75: ...plies to products less than or equal to 20 A per phase This statement applies to products greater than 20 A single phase This statement applies to products greater than 20 A per phase three phase Japa...

Страница 76: ...lectromagnetic Interference EMI statement Homologation statement This product may not be certified in your country for connection by any means whatsoever to interfaces of public telecommunications net...

Страница 77: ......

Страница 78: ...IBM SC27462802...

Отзывы: