27
5 INSTALLATION
5.1 INSTALLATION AREA TO BE SET UP BY THE USER
Before starting to work the user should make sure that:
-
there aren’t any unauthorised persons within the selecte
d work setting;
-
there aren’t any foreign objects hindering the installation work or making it unsafe.
5.2 IBIX ECO-BLASTER PACKAGE OPENING & ASSEMBLY
The machine is delivered to the Customer contained in its special packaging (carton)
[1]
with
some disassembled parts (lifting handle and filling lid).
PACKAGE OPENING:
-
Place the box on the floor
[2
], use a cutter to cut the tape joining the bottom flaps.
-
Stand up the box again with open flaps and remove the packaging by the special handles
[3
].
- Release the machine from its preformed wrapping
[4]
.
1
2
3
4
Содержание 25
Страница 4: ...3...
Страница 10: ...9...
Страница 22: ...21...
Страница 26: ...25...
Страница 30: ...29...
Страница 31: ...30 ECO BLASTER IBIX 25 6 START UP 6 START UP page 30...
Страница 33: ...32 E E E D D D A H B I J C G F...
Страница 34: ...33...
Страница 44: ...43...
Страница 57: ...56 9 9 Conformity declaration n 493 ABR ORINOCO HP 14x25...