1.3.2.4 PASSWORD POP-UP WINDOW

Access to setup areas that allow operational parameters to be changed can be 

restricted by requiring a password to be entered. If the Security mode is on then 

the password pop-up window with will appear as soon as a button is pressed that 

provides access to a restricted area. The password is factory set and cannot be 

changed.
The password window shows 4 digits with an up arrow and down arrow 

button above and below the digit. The password graphic looks similar to some 

combinations locks. Touching the arrow button above or below the digit will cause 

the digit to increment up or down respectively. Tap the appropriate buttons until 

the desired password is displayed. Pressing 

OK

 will close the popup and then 

grant access. Access to secure areas will remain available for 15 minutes without 

having to reenter the password.

1.3.2.5 SLIDE BAR

The Slide Bar (left side) allows the viewing of a list that is longer than will fit 

inside the active display area. For example, while editing a load in the installer 

menu, the list of items is longer than can fit on one screen. Simply touch and hold 

the Slide Bar until it turns blue and slowly drag it down. As you do the list of items 

viewable will scroll with the side bar. You can also tap the arrows at either end of 

the Slide Bar to move the bar up or down.

1.3.2.6 COMMON BUTTON ICONS

Save

 will save the displayed settings and return you to the previous screen. This 

button is found at the bottom left on all Setting Screens.

Back

 will return you to the previous screen without saving any changes. This 

button is found at the bottom right on all Setting Screens and all menu screens.

OK

 will accept the settings displayed in a pop-up window and close the window. 

This button is only found at the bottom left of a pop up window.

Cancel

 will ignore the settings displayed in a pop-up window and close the 

window. This button is only found at the bottom right of a pop-up window.

Edit

 is only available in the 

Installer Settings

 menu and only active on loads 

that have been defined. Pressing 

Edit

 will enter the settings screen for the 

corresponding load or setting.

Close

 appears at the bottom of a Warning pop-up window. 

View

 is only available in the Error Log to display the particular Minor errors, Major 

errors or System faults associated with the logged error event.

The single 

Up

 and 

Down

 arrow is available in the Error Log menu and enables 

you to scroll through the list of event records one at a time.

The single 

Left

 and 

Right

 arrow is available in the 

Load Profiles

 screen to scroll 

through the 4 separate loads plus the remote load if the boiler is operating as part 

of a multi boiler network.

Содержание V-10

Страница 1: ...OPERATING INSTRUCTIONS www ibcboiler com V 10 TOUCH SCREEN BOILER CONTROLLER This Manual is also available in French contact IBC or visit our web site www ibcboiler com...

Страница 2: ......

Страница 3: ...5 5 2 SYSTEM SETTINGS 10 1 5 6 DIAGNOSTICS 10 1 6 SEQUENCE OF OPERATION 12 1 6 1 STANDBY 13 1 6 2 PURGING 13 1 6 3 IGNITION 13 1 6 4 HEATING 14 1 6 5 CIRCULATING 14 1 6 6 ERROR MODE 15 1 7 OTHER OPERA...

Страница 4: ......

Страница 5: ...card or USB stick Superior warning messages while setting up the control Advanced Error messages with visual display on the Home Screen Internet LAN connectivity BACnet with activation CONTROL When th...

Страница 6: ...rea consisting of the screen title bar at the top and a boarder surrounding the active area At the bottom of the display there is space reserved for the boiler status bar Prior to any interaction with...

Страница 7: ...ry buttons are used to set the load type Radio buttons are used to select a setting from a list of options and can be used in conjunction with entry boxes A check box is used to select whether a speci...

Страница 8: ...viewable will scroll with the side bar You can also tap the arrows at either end of the Slide Bar to move the bar up or down 1 3 2 6 COMMON BUTTON ICONS Save will save the displayed settings and retu...

Страница 9: ...settings The User Setup selection provides a relatively simple interface allowing for the adjustment of settings relevant to the user while Installer Setup gives field access to the full functionalit...

Страница 10: ...2 Express Setup Express Setup is a quick and simple method to set all the necessary parameters for most single boiler installations Express Setup sets parameters to default values including all the a...

Страница 11: ...s of a load or to add settings for a programmed load Outdoor design temperature can be adjusted in the Installer Menu 1 5 3 Load Status Touching one of the Load 1 to 4 buttons will bring up a status d...

Страница 12: ...previously known as Load Pairing feature Refer to section 1 7 2 System Settings leads to a menu screen where the Site Settings Network Settings Security Licensing and Backup Restore selections are av...

Страница 13: ...pump to operate for a period of time to transfer heat that is stored in the boiler s heat exchanger into the hot water tank This feature is adjustable in seconds from 0 to 900 15 min If the load has...

Страница 14: ...e time manual pump purge and the variable speed output control settings The Network Settings screen is used to assign the boiler its ID address and network configuration to support multi boiler operat...

Страница 15: ...sors status screen displays the current active value for each of the pressure sensors the water Flow Rate VS Load Duty Cycle and the Altitude If a sensor is not connected to the controller it will dis...

Страница 16: ...history is not cleared Reset Factory Defaults will take approximately 2 minutes to complete Over time the touch pad calibration can drift slightly resulting in the touch locations being out of line wi...

Страница 17: ...iler target water temperature 1 2 the Supply Differential The cut off temperature levels are specific for each load for space heating they are determined using the preset target plus 1 2 of the Supply...

Страница 18: ...ater temperature is 1 2 of the supply differential below setpoint temperature The boiler can also enter the Circulating mode during transition from any high temperature load e g DHW at 180 F to the co...

Страница 19: ...the boiler s operation when more than one load has been defined Typically loads declared as DHW receive significant but not absolute priority Multiple heating loads with varying temperature targets ar...

Страница 20: ...id equal ratings NOTE the priority scale values do not need to add up to 100 they are relative only to each other 1 7 2 Load Combining The controller allows two loads of compatible temperature setting...

Страница 21: ...ottle has no effect once the loads have been combined 1 7 2 1 CONSIDERATIONS FOR COMBINING LOADS The Primary and Secondary loads must have compatible temperature parameter settings or the Secondary lo...

Страница 22: ...exes the boiler supply temperature according to characterized heating curves that are automatically called up through the load declaration process Curves are provided for each of the radiation termina...

Страница 23: ...baseboards sink very little heat when operated below 90 F 32 C application of a full reset curve e g 160 F 71 C right down to a 70 F 21 C room target would cause boiler cycling in light to moderate h...

Страница 24: ...upied mode the DHW load is turned off while a Reset Heating load will have it s circulating water temperature lowered by reducing the Indoor Setpoint to 50 F 10 C Set Point controlled loads are not ad...

Страница 25: ...oads with the same priority logic and sequencing 1 7 9 Alarm Contacts The controller provides a relay dry contact connection to indicate the boiler s alarm state externally This can be used for exampl...

Страница 26: ...work the JA02 must be removed on the middle boiler only Please contact IBC if any additional information is required 1 7 11 Internet Networking Internet Protocol IP networking based features are suppo...

Страница 27: ...outer connecting the boiler s local area network to the Internet have its port forwarding settings configured to forward port 80 to the boiler s local IP address In this case the remote browser will a...

Страница 28: ...OPERATING INSTRUCTIONS 24 V 10 TOUCH SCREEN BOILER CONTROLLER DIAGRAMS ELECTRICAL WIRING DIAGRAM 2 0 2 1...

Страница 29: ...rm 2 TB2 7 Therm 3 TB2 8 or Therm 4 TB2 9 depending on the load it is intended to control Power stealing thermostats take a small amount of current from the 24 VAC to operate their internal electronic...

Страница 30: ...e white black black Vent High Limit Switch Upper Vessel High Limit Switch Water High Limit Switch white yellow black yellow red white red white white white white white black yellow yellow black black...

Страница 31: ...PERATING INSTRUCTIONS V 10 TOUCH SCREEN BOILER CONTROLLER CONTROLLER BOARD LAYOUT 2 3 NOTE See Instruction Sheet for instructions on installing a V 10 Touch Screen Boiler Controller Re Order Part 500...

Страница 32: ...OPERATING INSTRUCTIONS 28 V 10 TOUCH SCREEN BOILER CONTROLLER SEQUENCE OF OPERATION 2 4...

Страница 33: ...NOTES...

Страница 34: ...NOTES...

Страница 35: ...REVISION HISTORY R1 JULY 2014 Initial release R2 JULY 2015 Address update...

Страница 36: ...IBC Technologies Inc 8015 North Fraser Way Burnaby BC Canada V5J 5M8 Tel 604 877 0277 Fax 604 877 0295 www ibcboiler com 120 198 R2 July 2015 IBC Technologies Inc 2015...

Отзывы: