
Term
Definition
Staging
Delay
The number of minutes between boilers being fired up or shut down by the master, that
is, the length of time before the next boiler is brought online once the current firing
boiler has passed its add boiler firing rate level. It must be at minimum equal to time for
closed-loop water to complete one full circuit of system. For large mass systems,
allow for two or more loop times.
Water° From
The Default setting is Outlet. When set to Outlet, the controller determines the supply
water temperature from the outlet temperature sensor on the boiler. Alternatively the
2nd Loop Sensor or the DHW Sensor input terminals can be wired to a water
temperature sensor. To support these alternate wiring options the Water ° From setting
must be set to Sec. Loop on DHW to correspond with the wiring. Multi-boiler: Most
have an external sensor mounted on the building supply water.
92
Section: Definition of terms
Содержание V-10
Страница 1: ...V 10 TOUCHSCREEN CONTROLLER MANUAL VX SERIES...
Страница 40: ...Intentionally left empty...
Страница 50: ...Intentionally left empty...
Страница 66: ...Intentionally left empty...
Страница 96: ...Internal wiring diagram VX series boilers Figure 21 VX series internal diagram 94 Section Appendices...
Страница 97: ...Wiring diagram Opt Out DHW Figure 22 Opt Out DHW wiring diagram 95 Wiring diagram Opt Out DHW...
Страница 98: ...Sequence of Operation VX series boilers Figure 23 VX series Sequence of Operation 96 Section Appendices...
Страница 102: ......