background image

IBC Technologies Inc.

8015 North Fraser Way

Burnaby, BC Canada V5J 5M8

Tel: 604-877-0277

Fax: 604-877-0295

Toll Free: 1-844-432-8422

www.ibcboiler.com

November, 2019

©IBC Technologies Inc. 2019

120-329

Содержание EX 850

Страница 1: ...s and liquids or other combustible materials in the vicinity of this or any other appliance If you smell gas Do not try to light any appliance Do not touch any electrical switch do not use any phone i...

Страница 2: ...he amount of solids that may form on the heat exchanger will depend on the degree of hardness and the total water volume in the system A high water volume system with a low hardness count may cause as...

Страница 3: ...3 Important safety instructions 3 Domestic hot water 6 Boiler operation 8 Lighting and shutting down the boiler 8 Service and maintenance 9 Maintenance checklists 9 Relief valve maintenance and testin...

Страница 4: ...Intentionally left empty...

Страница 5: ...with all instructions and applicable national and local codes may result in hazardous conditions that could result in property damage and injury to occupants and in extreme cases to death Keep instru...

Страница 6: ...g installation start up operation or service Installation and service must be performed only by an experienced skilled installer or service agency Failure to follow all instructions in the proper orde...

Страница 7: ...and use of respirators certified by NIOSH For the most current information NIOSH can be contacted at 1 800 356 4676 or on the web at www cdc gov niosh 2 Wear long sleeved loose fitting clothing glove...

Страница 8: ...being scalded Never leave then unattended in or near the shower bathtub or sink Never allow small children to use a not water faucet or draw their own bath To avoid any potential scald hazard or if co...

Страница 9: ...Warning Bacteria growth can develop in domestic hot water tanks and indirect water heaters if the minimum water temperature is not set high enough to prevent its growth 7 Domestic hot water...

Страница 10: ...Boiler operation Lighting and shutting down the boiler 8 Section Contents...

Страница 11: ...al contaminates Monthly Maintenance Check Check all the Daily Maintenance items Check the pressure relief valve and discharge piping for signs of leakage or moisture If water or moisture is found cont...

Страница 12: ...heck the ignition electrode and remove oxidation from the electrode Replace if necessary Check the gas valve and ignition cable Check the controller settings Check the burners flame Should be a quick...

Страница 13: ...that under normal operating conditions a try lever test must be performed every two months Under severe service conditions or if corrosion and or deposits are noticed within the valve body testing mu...

Страница 14: ...Revision history R0 September 2019 Initial release...

Страница 15: ...IBC Technologies Inc 8015 North Fraser Way Burnaby BC Canada V5J 5M8 Tel 604 877 0277 Fax 604 877 0295 Toll Free 1 844 432 8422 www ibcboiler com November 2019 IBC Technologies Inc 2019 120 329...

Отзывы: