Page 2
Check the equipment upon arrival for damage or shortages and report same to our Office or
Agent before commencing installation.
Locate the unit and brine tank on a firm level clean foundation, preferably concrete, with
sufficient space for operation and maintenance. Position the tanks in their correct position
before loading the media.
Step 1:
Remove the top tank flange/strainer assembly by unscrewing out the larger
diameter flange and make sure the softener tank is empty and clean. It is
recommended to utilise special ‘C’ type spanners available from I.B.C.
Step 2:
Bottom distributor assembly is pre-assembled and installed in the Softener Tank.
Step 3:
Place a 40mm or 50mm plastic pipe through the top hand hole that will reach to
the bottom of the softener tank. Carefully pour the underbed gravel through this
pipe so as not to damage the distributor assembly.
Step 4:
Pour in the underbed gravel (No.6) evenly around the tank, 120kg.
Step 5:
Level out the underbed gravel using a broom handle/PVC pipe. The underbed
gravel should cover the bottom distributor by about 25mm.
Step 6:
Fill the tank with water to about 1/2 full of water.
Step 7:
Load the 500 litres of C100E resin. The resin is shipped in 25L bags.
Step 8:
Completely fill the tank with water.
Step 9:
Clean top of tank of all traces of resin.
Step 10: Unpack the valve and pipe work, check that each union has its ‘O’ ring.
INSTALLATION
MEDIA INSTALLATION
Содержание AS30500
Страница 13: ...Page 13 BRINE TANK SETUP ...
Страница 14: ...Page 14 ...
Страница 15: ...Page 15 Series 172 Commercial Industrial Control System Water Softener ...
Страница 19: ...Page 19 ...
Страница 20: ...Page 20 ...
Страница 23: ...Page 23 ...
Страница 25: ...Page 25 REPLACEMENT PARTS ...