![IBC Technologies VFC 15-150 Скачать руководство пользователя страница 2](http://html2.mh-extra.com/html/ibc-technologies/vfc-15-150/vfc-15-150_installation-and-operating-instructions-manual_3224064002.webp)
IBC Technologies Inc.
2
VFC 15-150 and VFC 45-225
TABLE OF CONTENTS
1
INSTALLATION ...................... 3
1.1
GENERAL..........................................3
1.2
CODE REQUIREMENTS ................4
1.3
Location...............................................4
1.4
Venting ................................................5
1.4.1
Applications 6
1.4.2
“Category IV” Venting..................13
1.4.3
Closet Installations ........................13
1.5
Water Piping.....................................14
1.5.1
General Piping Issues ....................14
1.5.2
Installation Rules:- ........................16
1.6
Gas Piping.........................................19
1.7
Electrical Connections .....................19
1.7.1
“110V” Hook-up ...........................19
1.7.2
Power Quality and Electrical
Protection .................................20
1.7.3
Zone Valve Hook-up.....................20
1.7.4
Thermostat / Sensor Wiring ..........21
1.7.5
Other wiring 21
1.7.6
Thermostat Heat Anticipator .........21
2
BOILER SYSTEMS AND
OPERATION................................. 22
2.1
GENERAL........................................22
2.2
CONTROL .......................................22
2.3
USER INTERFACE.........................22
2.3.1
Keypad Functions..........................22
2.3.2
LCD Display 22
2.4
ACCESS LEVELS ...........................23
2.4.1
User setup .................................24
2.4.2
Installer Setup................................24
2.4.3
Advanced Setup.............................24
2.4.4
Advanced Diagnostics...................24
2.4.5
Passwords .................................24
2.5
SEQUENCE OF OPERATION ......25
2.5.1
Standby .................................25
2.5.2
Purging .................................25
2.5.3
Ignition .................................25
2.5.4
Heating .................................26
2.5.5
Circulating .................................26
2.5.6
- Error Mode .................................27
2.6
OTHER OPERATING FEATURES .
........................................................... 27
2.6.1
Prioritization .................................27
2.6.2
Reset Heating ................................28
2.6.3
Variable Speed Pumping ...............29
2.6.4
Temperature Setback .....................30
2.6.5
Unoccupied Mode .........................30
2.6.6
Summer Shutdown ........................30
2.6.7
Remote / Slave Mode ....................30
2.7
SET UP & LOAD DEFINITION... 31
3
STARTUP & COMMISSIONING
35
3.1
PRIOR TO START-UP .................. 36
3.1.1
Test Ignition Safety Shutoff ..........36
3.2
GAS VALVE ADJUSTMENT ....... 36
4
MAINTENANCE AND
TROUBLESHOOTING..................38
4.1
BOILER MAINTENANCE............ 38
4.1.1
General Care .................................38
4.1.2
Inspection .................................38
4.2
COMPONENT DESCRIPTION.... 40
4.3
TROUBLESHOOTING GUIDE ... 42
4.3.1
Preliminary Checks .......................42
4.3.2
Troubleshooting Electronic
Components .................................42
4.3.3
Troubleshooting using the Control45
4.3.4
Detailed System Checks ................47
5
DIAGRAMS ...........................51
5.1
Parts Diagrams ................................ 52
5.2
Wiring Diagram .............................. 54
5.3
Sequence of Operations Flowchart 55