background image

 EN

TECHNICAL DATA

Minimum dynamic pressure:_________________________________________________________0.5 bar

Maximum operational pressure:________________________________________________________5 bar

Recommended operational pressure:_________________________________________________1-5 bar

 

It’s recommended to use a pressure reducer in case of

 

static pressure superior than 5 bar inside the waterpipe.

Maximum hot water temperature:_______________________________________________________80°C

INSTALLATION, MAINTENANCE AND PRELIMINARY CHECKING PROCEDURE

In order to get your device work correctly and fine in time, must ensure compliance with the 

mode of installation and maintenance described in this booklet. Relying on a qualified plumber. 

Make sure that the system is free from all debris and impurities existing.

INSTALLATION

Fig. 1:

 Arrange the floor system with a G1 / 2 “F threaded connection, taking care to keep a 

distance from the edge of the ceramic to the center of the threaded connection of MIN 70 mm 

- 2.75 in. With a hole of MAX Ø30 mm - 1.18 in.

Fig. 2:

 Screw the threaded insert to the threaded connection, using PTFE to ensure tightness.

Fig. 3:

 Drill the holes in the floor by inserting the plugs. Insert the body into the insert, fixing it 

with the screws.

After connecting the body to the system, turn on the stopcocks and check that the mixer tap 

unit operates correctly. Keep the tap pressurised for a few minutes checking eventual leaks.

Fig. 4:

 Position the carter.

CLEANING

In order to obtain a correct cleanliness, exclusively wash them with soap and water, rewash and 

dry them with a soft towel and deerskin. Avoid the usage of alcohol, solvents, solid or liquid 

detergents which contain corrosive or acidic substances, abrasive sponges, swab with metallic 

strings because they could irreversibly compromise the surfaces.

THE USAGE OF THIS KIND OF DETERGNETS DURING THE CLEANING OF THE MIXER EXCLUDE 

IB RUBINETTERIE FROM ANY WARRANTY OBLIGATION.

Содержание ELIO 396

Страница 1: ...ISTRUZIONI DI MONTAGGIO FITTING INSTRUCTIONS NOTICE DE MONTAGE ELIO 396 397 EO396_1 EO396_2 EO397_1 EO397_2...

Страница 2: ...al piano e avvitare la ghiera esagonale per bloccare il tutto Terminare il bloccag gio stringendo le viti da sotto il piano Fig 4 Posizionare la maniglia quadra e avvitare il grano fino al completo bl...

Страница 3: ...body that comes out from the worktop and screw the hexagonal ring nut to lock everything Tight the screws from under the worktop Fig 4 Position the square handle and screw the grubscrew until it is co...

Страница 4: ...la bague et le joint Ins rez le corps du m langeur par le dessous de la surface Vissez la rosette sur le corps du m langeur qui d passe du haut et vissez l crou hexagonal pour tout verrouiller Termin...

Страница 5: ...Fig 1...

Страница 6: ...Fig 2...

Страница 7: ...Fig 3...

Страница 8: ...Fig 4...

Страница 9: ...Fig 5...

Страница 10: ...Fig 6...

Страница 11: ...Fig 7...

Страница 12: ...Rev 19 05 2021...

Страница 13: ...ISTRUZIONI DI MONTAGGIO FITTING INSTRUCTIONS NOTICE DE MONTAGE REFLEX 299 399...

Страница 14: ...on un attacco filettato G1 2 F avendo cura di tene re una distanza dal bordo della ceramica al centro dell attacco filettato di MIN 70 mm 2 75 in Con un foro di MAX 30 mm 1 18 in Fig 2 Avvitare l inse...

Страница 15: ...F threaded connection taking care to keep a distance from the edge of the ceramic to the center of the threaded connection of MIN 70 mm 2 75 in With a hole of MAX 30 mm 1 18 in Fig 2 Screw the thread...

Страница 16: ...nettoy es par toutes salet s et r sidus INSTALLATION Fig 1 Pr parez le syst me au sol avec un raccord filet G1 2 F en prenant soin de garder une distance entre le bord du carrelage et le centre du ra...

Страница 17: ...Fig 1...

Страница 18: ...Fig 2...

Страница 19: ...Fig 3...

Страница 20: ...Rev 19 11 2020 Fig 4...

Отзывы: