31
Workmaster Isolation Screen
Item
Description
Qty
1
ISO Screen Panel
1
HARDWARE KIT HWR079
A
Bolt, 1/4-20 X 1.00 HHW Black
4
B
Washer, 1/4 Flat Black
4
C
Grommet Rubber 1.50 ID
2
D
Well nut 1/4-20 Brass Insert
4
Step 1:
Install
ISO screen panel by installing four 1/4-20 well nuts item D into the holes in the back of the riser boxes.
Step 2:
Place the isolation screen panel against the back of the riser boxes with the flanges toward the inside of the
worksurface and attach it using the four 1/4-20 X 1.00 bolts item A and the four 1/4 flat
washers item B. Be
sure to push the isolation screen against the well nuts as the bolts are being threaded into the well nuts.
Install the rubber grommets into the holes provided.
Step 3:
Installation of ESD isolation screens is done the in the same way using hardware kit HWR138. Attach the
ESD ground cord to one of the snaps on the isolation screen. Feed the ground cord through one of the holes
in the isolation screen and attach it to the ground stud in the underside of the worksurface.