12
Step 3:
Carefully turn instrument shelf over and align the holes on the bottom of riser boxes with the inserts in the
instrument shelf. Attach the riser boxes with the 1/4-20 x .75 hex head bolts and 1/4 flat washers as shown.
Tighten hardware at this time being careful not to over tighten the hardware going into the inserts in the
instrument shelf.
If you have ordered Upper Bin Panels please see page 32
before going onto Step 3. If you have ordered riser
electrical panels and/or instrument shelf electrical channels see Part 2 of the assembly instruction packet for
wiring instructions.
Step 4:
Align the riser covers holes with the holes in the riser box and thread #8 x .375 screws item D into each hole.
Tighten at this time.
Step 5:
Install plug caps items E, F, G to all open holes on the riser boxes.