12-1
*A to F and P, T denote the position of the port.
12-1 Specification and Structure
A.C.E.P. port
Control valve-Dozer
Control valve
Travelling leftward
Control valve
Travelling leftward
Control valve
Travelling rightward
Control valve
Travelling rightward
B.D.F. port
Control valve
Dozer
Dozer cylinder
Dozer cylinder
Over drive
Rightward travelling motor
Leftward travelling motor
Rightward travelling motor
Leftward travelling motor
A
T
B
CDE
F
P
A
T
F
P
B
D
C
E
Drain
45
45
Overdrive
Working pressure
Screw size(Body)
Screw size(Shaft)
Working speed
0.3MPa(3kgf/cm
2
)
3.4Mpa(35kgf/cm
2
)
18.6MPa(190kgf/cm
2
)
G 1/4
G 3/8
R 1/4
R 3/8
rpm
T
E
A
〜
D, F, P
E, F, P, T
A
〜
D
E, F, P, T
A
〜
D
Содержание Robex 22-7
Страница 1: ...SERVICE MANUAL SER NO HY2270001...
Страница 2: ......
Страница 4: ......
Страница 8: ...2 1 Location of Serial Number 2 1...
Страница 24: ......
Страница 32: ......
Страница 42: ...5 5 Throttle valve Hydraulic pressure tester OUT IN OPEN CLOSE...
Страница 44: ......
Страница 46: ...6 1 Installation 6 1 J S Left J S J S Right J S...
Страница 50: ......
Страница 59: ...8 JOYSTICK PILOT VALVE CONTENTS 8 1 Specification 8 2 Structure...
Страница 67: ......
Страница 73: ......
Страница 80: ...12 SWIVEL JOINT CONTENTS 12 1 Specification and Structure 12 2 Structure disassembly and assembly...
Страница 83: ......
Страница 96: ...15 IDLER CONTENTS 15 1 Standard of maintenance 15 1 1 Idler...
Страница 101: ......
Страница 102: ...17 TRACK ROLLER CONTENTS 17 1 Standard of maintenance 17 1 1 Track roller...