3-2 Inspection and adjustment
3-2-1 Measuring the natural fall of the attachment
1. Measuring the location of the attachment
Set the temperature of the hydraulic oil to 50
±
5
°
C. Adjust the height of arm/bucket joint
so that it equals that of the boom joint. Then, retract the dozer cylinder to the minimum
length and stop the engine.
2. Measurement
Draw a reference line on the cylinder head with a Magic Marker and measure the
length from the line to the cylinder tube. Measure the length again 3 minutes later.
Then record the difference in the length
Unit: mm or less
Cylinder name
Standard value
Allowance
Boom cylinder
3
10
Arm cylinder
3
10
Bucket cylinder
3
10
Dozer cylinder
3
10
Make 1 and 2 the same height.
W: Weight
About: 108kg
3-5
Arm cylinder
Boom joint...1,
Boom cylinder
Bucket cylinder
Arm/bucket joint...2,
Dozer cylinder
Mark: Direction of cylinder movement
Содержание Robex 22-7
Страница 1: ...SERVICE MANUAL SER NO HY2270001...
Страница 2: ......
Страница 4: ......
Страница 8: ...2 1 Location of Serial Number 2 1...
Страница 24: ......
Страница 32: ......
Страница 42: ...5 5 Throttle valve Hydraulic pressure tester OUT IN OPEN CLOSE...
Страница 44: ......
Страница 46: ...6 1 Installation 6 1 J S Left J S J S Right J S...
Страница 50: ......
Страница 59: ...8 JOYSTICK PILOT VALVE CONTENTS 8 1 Specification 8 2 Structure...
Страница 67: ......
Страница 73: ......
Страница 80: ...12 SWIVEL JOINT CONTENTS 12 1 Specification and Structure 12 2 Structure disassembly and assembly...
Страница 83: ......
Страница 96: ...15 IDLER CONTENTS 15 1 Standard of maintenance 15 1 1 Idler...
Страница 101: ......
Страница 102: ...17 TRACK ROLLER CONTENTS 17 1 Standard of maintenance 17 1 1 Track roller...