www.hhigreen.com
Page 5 of 18
Sales Office
Bundang First Tower, 55, Bundang-ro,
Jongno-gu, Seongnam-si, Gyeonggi-do
13591, Korea
Factory
313, Soi-ro, Soi-myeon, Eumseong-gun,
Chungcheongbuk-do 369-872, Korea
8
8-Ф7 SLOT THRU
11
DETAIL A
A
GROUND MARK
8 x
Ø
7-L11
MOUNTING HOLES
494
736
47
325
253
2
0
0
±
2
0
160±20
1000mm 4mm
CABLE AND
CONNECTOR
(-)
2
1000mm 4mm
CABLE AND
CONNECTOR
J-BOX
2 MOUNTING HOLES
2 MOUNTING HOLES
2 MOUNTING HOLES
47
325
4 x
Ø 4.2
GROUND HOLES
GROUND HOLE
GROUND HOLE
GROUND HOLE
A
J-BOX
2 MOUNTING HOLES
2 MOUNTING HOLES
2 MOUNTING HOLES
60
360
4 x
Ø
4.2
GROUND HOLES
GROUND HOLE
GROUND HOLE
GROUND HOLE
800
60
360
253
954
548
8 x
Ø
7-L11
MOUNTING HOLES
GROUND MARK
D
D
A
2
0
0
±
2
0
160±20
2
(+)
1000mm 4mm
CABLE AND
CONNECTOR
(-)
2
1000mm 4mm
CABLE AND
CONNECTOR
installer should check salt damage of the installed area.
·
PV modules shall not be immersed in water and shall not be continually exposure to Water from a
sprinkler, fountain, etc.
·
PV modules shall not be installed in sulfurous area near sulfurous volcano and sulfurous spring.
·
If PV modules are installed near factory or plant area, they can be polluted by fumes and the pollution
may not be cleaned. Thus the installer should consider and check the installation area and the
distance from factory or plant area.
·
If PV modules are installed in damp environments, the installer should check the installation area to
see if there is a possibility that moss grows in PV modules.
3.4 Mounting Method
·
Generally
modules are fixed using mounting holes of long frame.
·
Each module must be securely
fixed
at a minimum of 4 points on two
each
side of long frame or short
frame.
·
The mounting design must be certified by a registered professional engineer. The mounting design
and procedures shall comply with local electrical and building codes.
·
Mounting hardware is not provided by HHIGE.
·
Mounting hardware like Picture 4. is highly recommended by clamping or bolt & nut mounting(Torque
level: 4~5 N·M, M6 Bolt/Nut).
·
Detailed mounting method is described in ‘module installation instruction’ in the appendix.
·
<RF(TF) Series> <RG(TG) Series>
Picture 1. HiS-SxxxRF(TF) / -MxxxRF(TF) / -SxxxRG(TG) / -MxxxRG(TG) Hole Position