1. Technical Specifications
Product type Dual sense DALI sensor ( HF and PIR, Tri-level control )
Operating voltage 9.5~22.5VDC (suitable DALI power supply)
Input current Approx.12mA
Power consumption 0.25W
Detection angle 360
o
Detection area (DxH) 12 x 6m (Maximum)
Mounting height 6m (Maximum)
Detection range 10% / 50% / 75% / 100%
Hold time 2s / 30s / 1min / 5min / 10min / 15min / 20min / 30min
Stand-by time 0s / 10s / 1min / 5min / 10min / 30min / 1h / +∞
Stand-by dimming level 10% / 20% / 30% / 50%
Daylight threshold 2Lux /10Lux / 50Lux / Disable
Warmming up time 30s
Operating temperature -20
o
C ~ +50
o
C
Sensor mode PIR, HF, PIR+HF, PIR / HF
3. Rotary Switch Settings
A rotary switch is built inside the sensor for
scene selection / fast programming. Total
16 channels available:
Note: settings can also be changed by remote control HRC-11. The last action controls.
SURFACE MOUNT DUAL SENSE DALI SENSOR HIM13
Rotary switch preset (Please
see the location in 2. Installation)
Detection
range
Channel
0
1
2
3
4
5
6
7
8
9
A
B
C
D
E
F
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
75%
50%
100%
100%
100%
5s
1min
5min
5min
5min
5min
5min
10min
10min
10min
10min
10min
10min
30min
30min
5s
10s
5min
10min
30min
0s
+∞
+∞
10min
30min
+∞
+∞
+∞
+∞
+∞
+∞
10s
10%
10%
10%
10%
Disable
10%
30%
10%
10%
10%
30%
10%
10%
10%
30%
10%
Disable
2Lux
10Lux
30Lux
10Lux
30Lux
Disable
2Lux
10Lux
30Lux
Disable
30Lux
10Lux
50Lux
Disable
2Lux
Hold
time
Stand-by
time
Stand-by
dimming level
Daylight
threshold
4. Sensor Mode Selection
Sensor mode can be easily selected by choosing the correct combination of the DIP switches
(see table below):
HIM13-20190104-A1
HF
PIR
HF+PIR
HF/PIR
1 2
I
II
III
IV
DALI group selection (Please
see the location in 2. Installation)
5. DALI group selection
DALI group configuration can be done on PC or on the rotary switch:
1. There are 16 channels available on the rotary switch. “0” is
for DALI broadcast, the rest 15 channels is for end user to
define the application unit.
2. PC grouping can overwrite rotary switch grouping, and vise
versa. The last setting controls.
Switch channel
DALI group
Switch channel
DALI group
0
1
2
3
4
5
6
7
broadcast
group 0
group 1
group 2
group 3
group 4
group 5
group 6
8
9
A
B
C
D
E
F
group 7
group 8
group 9
group 10
group 11
group 12
group 13
group 14
HF+PIR: Light is on when both HF
and PIR sensors are activated.
HF/PIR: Light is on when HF or PIR
sensors are activated.
Installation and Instruction Manual
TM
2. Installation
Warnings:
1. Installation must be carried out by a
qualified engineer in accordance with
local regulations.
2. Disconnect supply before installing.
3. Install to a solid surface - vibrations may
cause mis-triggering.
4. Ensure environmental conditions are
suitable for electronic equipment
Direct junction “J” box mounting
a. Separate control board (A) from facia (B)
& junction box (C).
b. Make electrical connections to control board
(A). See detailed wiring diagram on next page.
c. Secure control board (A) to junction box.
d. Set-up sensor modes as per sections 3 & 4
of this manual.
e. Clip facial plate (B) to control board (A).
Surface mount assembly
a. Separate control board (A) from facia (B) &
Surface box (C).
b. Securely mount surface box (C) to a flat and
solid surface.
c. Make electrical connections to control board
(A). See detailed wiring diagram on next page.
d. Set-up sensor modes as per sections 3 & 4 of
this manual.
e. Secure control board (A) to surface box (C).
f. Clip facial plate (B) to control board (A).
The rotary switch channel is corresponding to the groups listed below:
Infrared receiver
HF Sensor module
Photocell
PIR
LED indicator
Sensor mode selection
Rotary switch preset
DALI group selection
A - Control Board
29
56
50.2
55.2
109
38.6
56
A
56
A
B
B
C
C
Blind
A
B
Blind
Note: the blinds are optional, they may be inserted behind the lens for focussing the detection range.
C - Surface box
B - Facia Cover
11 43.5
64.7 69.1