background image

I

nstaller

s

 C

heCklIst

  

Date Installed: ________________  Gate Operator Model: _________________________________________________________________ 

Site Location: __________________________________________________________________________________________________________  

HyNet Serial Number: ___________________________________

Gate Operator Serial Number: ___________________________

Gate Operator Serial Number: ___________________________

Gate Operator Serial Number: ___________________________

Gate Operator Serial Number: ___________________________

Customer Name: _______________________________________________________________________________________________________

Mailing Address: ________________________________________ 

Inspected by: ____________________________________________

________________________________________________________ 

Date Inspected: __________________________________________

Phone Contact: _________________________________________ 

Phone contact number: ___________________________________

 

Checked Initials

1. Site Planning

 

 

 _____________

RJ-45 cable to system network.

2. Safety

 

 

 _____________

Review 

Important Safety Information

 in the gate operator's product manual.

Warning labels apparent and affixed properly.

Area around the gate and gate operator free of debris, cabinets/chassis include locking mechanism.

3. Electrical

 

 

 _____________

3.1 Grounding

•  NFPA 780 Standard for the Installation of Lighting Protection Systems.
•  Solid copper ground rod (

-inch diameter, 10 ft length) driven into ground within 3 ft of the gate operator.

•  Single length of unspliced 6AWG copper wire less than 3 ft long attached to lug nut in gate operator.

3.2 Gate operator has current software loaded.

3.3 Configure the Controller

•  Set the System Address (SA) in the Installer Menu. 
• 

Communicate (verify) system address to IT Network Admin for proper web page configuration.

4. Review gate operator installation checklist from gate operator manual

 

 

 _____________

5. Take photographs of installation and provide an End User Demo

 

 

 _____________

www.hysecurity.com  

©

 2016 

StrongArmPark DC Installation 

D0719 Rev. C 

  7  

Содержание StrongArmPack DCS 10

Страница 1: ...ArmPark DCS 14 This document is a supplemental document that provides specific information regarding configuration of the HySecurity gate operator with installation and wiring of the HyNet Gateway For...

Страница 2: ...ommunication is established between gate operator and HyNet 2 RED steady Gate operator network communication is not configured or established 2 RED flashing HyNet is attempting to connect to network w...

Страница 3: ...HyNet Assembly Velcro strip Peel off protective layer and adhere Velcro strip to HyNet mounting plate Alcohol wipe Use alcohol wipe to clean mounting plate surface before applying Velcro adhesive back...

Страница 4: ...5 6 Replace and secure covers 2 Peel protective paper off Velcro strip 3 Adhere the Velcro strip to the inside portion of the StrongArmPark DC chassis Press firmly NOTE Recommended HyNet location is...

Страница 5: ...DC Controller pin layout changed a few years ago On controllers with part numbers marked MX001457 and MX3037 Revisions A B and C be sure you re connecting the flying lead to the 24V spade located unde...

Страница 6: ...gate to Installer Menu item SA System Address 3 To exit Menu mode press Menu The gate operator returns to Run mode 4 Refer to Table 1 HyNet LED Indicators on page 2 Solid green means serial communicat...

Страница 7: ...__________ Phone contact number ____________________________________ Checked Initials 1 Site Planning ______________ RJ 45 cable to system network 2 Safety ______________ Review Important Safety Infor...

Страница 8: ...8 D0719 Rev C HyNet Attachment Kit MX3867 2016 www hysecurity com...

Отзывы: