7251 / 7351 Slide Gate Operator
INSTALLATION AND PROGRAMMING MANUAL
12
www.hysecurity.com • 800-321-9947
MX4514 Rev. A ©2019
SECTION 6: 7251 - POST-MOUNT INSTALLATION
MOUNT
POST #2
MOUNT
POST #1
IMAGE 1A-1:
INSTALLING THE TWO MOUNTING POSTS
IMAGE 1A-2:
AFFIXING CONTROL BOX TO MOUNTING POSTS
1A
7251: INSTALL POST-MOUNT CONTROL BOX
1. Secure two 3” posts in the ground as necessary for your type of soil conditions and building codes
per IMAGE 1A-1. Post height must be a minimum of 24” in above ground level.
2. Mount operator to posts at desired height using the four supplied 5/16” x 3” U-Bolts and 5/16” nuts
and tighten into place making sure operator is level.
DRIVEWAY
Direction of opening
Centerline of gate
3”
24”
Inside posts
3”
Diam.
3”
Diam.
5”
GATE
ROLLERS
3” U-BOLT
(x4)
3” U-BOLT (x4)
GATE
TOP VIEW
TOP VIEW