SS-IOM (05/14)
Page 5
Figure 4. Single Phase Wiring Schematic
Figure 5. Three Phase Wiring Schematic
7. Check all connections to see that they are correct and tight. Reassemble compresor unit
cabinet panels and apply power to the equipment. Cycle the EarthLinked
®
System to ensure
proper operation. The Sure-Start module could take up to six (6) starts to optimize the system.
Содержание EarthLinked Sure-Start
Страница 7: ...SS IOM 05 14 Page 7 Figure 6 SureStart Mode of Operation ...
Страница 8: ...SS IOM 05 14 Page 8 Single Phase LED Flash Codes ...
Страница 9: ...SS IOM 05 14 Page 9 ...