![Hydrotech 89 HIMTLC Series Скачать руководство пользователя страница 7](http://html.mh-extra.com/html/hydrotech/89-himtlc-series/89-himtlc-series_owners-manual_2192471007.webp)
7
Regeneration Process Explained
Backwash:
Backwash: During the backwash cycle, water enters tank #2 through the center of the distribution
tube and flows up- wards in the tank#2 expanding the media bed and carrying any precipitated contaminants
trapped within the bed. It then travels to tank #1 through the center of the distribution tube and flow upwards in
tank #1 and then out to the drain.
Brine Draw:
During the brine draw cycle, brine water enters tank #2 through the center of the distribution tube
and flows upwards in the tank #2 regenerating the media bed. It then travels to tank #1 through the center of
the distribution tube and flows upwards in tank #1 and then out to the drain.
Settle Rinse :
During the settle rinse cycle, water enters tank #1 down through the bed and up the through the
center of the distribution tube. It then travels to tank #2 down through the bed and up the through the center of
the distribution tube and out to the drain.
Refill :
During refill the control valve will put water into the brine tank for the next regeneration cycle.
Tank 2 Tank 1
Tank 2 Tank 1
Tank 2 Tank 1
Tank 2 Tank 1
Backwash
Brine Draw
Settle Rinse/Service
Refile
To
Drain
From
Brine
Tank
To
Drain
Содержание 89 HIMTLC Series
Страница 9: ...9 Installation...
Страница 21: ...21 Brine Tank Res Up Feeder Assembly 80030022 64 OZ PRO RESCARE...
Страница 22: ...22 Blank Page...
Страница 23: ...23 Blank Page...