At HydroHoist
®
we take pride in bringing the most advanced, easiest to use, and lowest maintenance boat lift sys-
tems to the market. Installation of the lift is simple due to its lightweight design and ease of operation.
The following pages contain step
-
by
-
step instructions of the installation and operation processes.
The Light Series HarborHoist
™
lift takes between 8 to 12 man
-
hours to assemble on average. Review all parts, hard-
ware, and required tools before beginning assembly. Don
’
t forget: safety first.
If you have questions, contact the Technical Support Team at 1
-
800
-
825
-
3379.
Legend:
Requires careful consideration
WARNING: could cause harm or damage to the lift, vessel, and user
INTRODUCTION
Lifts must be installed by an approved HydroHoist
®
installer. Failure to comply will result in termina-
tion of warranty and could cause injury to the user and damage to the lift and vessel.
It is STRONGLY recommended that each installer read the manual before attempting an installation.