CMP
Adjusting the counter balance valve
HYDAC FILTER SYSTEMS GMBH
en(us)
Page 28 / 36
BeWa CMP1321 3765034 en 2012-09-25.doc
2012-09-25
10. The CMP is now ready for
operation.
11. Switch off the CMP at the main
switch.
12
Remove the pressure gauge from
port (2) and seal it using the screw
plug.