1.3
BARFEED INSTALLATION
The H28A 120 machine is calibrated, adjusted, leveled, and inspected in the factory before shipping. The machine is
partially disassembled for shipping purposes. The two main parts of the machine are the front section and the conveyor
section. The installation consists of the following sections:
1. Mechanical
2. Hydraulic
3. Electrical
4. Guard
1. Mechanical Installation
Remove the bracket that holds the limit switch targets. This will need to be installed after the conveyor and the main
machine have been fastened together.
The conveyor and the main machine need to be connected together.
2 Bolts/Nuts
Содержание H28A-120
Страница 2: ......
Страница 12: ...0 8 Item 391335 Item 391938 ...
Страница 13: ...0 9 Item 391937 Idler Guide Arm Drive Guide Arm Item 391340 ...
Страница 14: ...0 10 Fixed Vise Shuttle Vise Item 392801 ...
Страница 72: ...4 1 ELECTRICAL SCHEMATICS SEE PDF ON ATTACHED CD SECTION 4 ELECTRICAL ...
Страница 73: ...5 1 SECTION 5 HYDRAULIC HYDRAULIC SCHEMATICS PLUMBING DIAGRAMS SEE PDF ON ATTACHED CD ...
Страница 74: ...6 1 MECHANICAL ASSEMBLY DRAWINGS PARTS LIST SEE PDF ON ATTACHED CD SECTION 6 MECHANICAL ASSEMBLIES ...
Страница 75: ...7 1 SECTION 7 OPTIONS OPTIONAL ASSEMBLY DRAWINGS SEE PDF ON ATTACHED CD ...
Страница 88: ...9 2 ...