Hycomp DS015 Скачать руководство пользователя страница 7

7

ODYSSEY-M01-001 Rev. 0

PRINTED COPIES FOR REFERENCE ONLY

outdoors, provide a rain cover or a completely enclosed 

shed to prevent corrosion.

If it is necessary to install the unit in a location that 

will experience operating temperatures below 32°F, a 

Hycomp crankcase heater must be installed.    If the 

booster is liquid cooled, suitable freeze protection must 

be provided for both the coolant and the machine.

FOUNDATION

Installations require the booster be secured to a 

concrete foundation pad.  The foundation should 

rest on solid bedrock, compacted earth, or gravel, 

but not a combination of any.  The pad should be 

composed of 4,000 psi cured concrete reinforced with 

ASTM A615 #4 billet steel re-bar cross laced on 16” 

centers located 3” above the base. Refer to 

Table 1 

for amount of concrete required. SAE Gr. 5 “J” bolting 

of appropriate length and size should be used in the 

pad to provide baseplate mounting.  Use of a template 

to support and position the b/– 1/16” while 

setting concrete is recommended.  Securing bolting to 

existing foundations with drilled holes and adhesives 

is not to be used, unless expert advice is available.  

RECEIPT OF BOOSTER

Immediately upon receipt of the booster, inspect the 

unit and associated components for damage that may 

have occurred during shipment. 

Shipping damage 

is not covered by Hycomp. Notify the shipping 

company if there have been any damages. 

Upon receipt of the booster, read the booster nameplate 

to confirm the model ordered.  Read the motor 

nameplate to ensure that the electrical requirements do 

not exceed existing conditions.  Hycomp requires that 

all personnel in charge of installation, maintenance, 

or service of a Odyssey booster read this manual and 

Operation Manual in their entirety.

LOCATION

Locate the booster in a dry, well ventilated and well lit 

area that accommodates inspection and maintenance 

access.  Provide an unobstructed machine boundary of 

at least 18” with adequate air flow and service space 

around the booster. The area in front of the control 

panel requires at least 36”. Check local electrical codes 

to ensure proper distance.  Rotating machinery should 

always display appropriate restrictive warnings and 

cautions to minimize risk of injury to personnel.

Rotating machinery can be a source of noise, which 

may require abatement or personnel exposure limits.  

Understand your service environment and prepare 

accordingly.  Noise from a typical Odyssey booster 

may exceed 80 dBA @ 3ft.  

Installation in locations exposed to ambient subfreezing 

temperatures is not recommended.  Exposure to direct 

sunlight, rain, wind, dust, snow, moisture, and other 

adverse environmental elements is not recommended 

and will reduce service life and increase maintenance 

requirements.  If it is necessary to install the unit 

BOOSTER INSTALLATION

GENERAL INFORMATION

NOTICE

:  Odyssey boosters must only be installed in systems which have been designed by qualified personnel.  

The system MUST conform to all applicable federal, state, local and national standards.  

This manual is intended to assist qualified technical personnel in the installation of Hycomp Nitrogen Boosters.

NOTICE TO HYCOMP CUSTOMERS

Hycomp recommends you order service and replacement parts according to the model number and serial number 

found on the nameplate of your booster.  Do not order parts from the general descriptions in this manual.  Ordering 

directly from Hycomp or a registered vendor will minimize the possibility of receiving incorrect parts for your booster.

Booster 

Model

Width 

(in.)

Length 

(in.)

Depth 

(in.)

Weight 

(lbs.)

DS015

27

52

8

975

DS026

27

52

8

975

DS033

27

52

14.5

1767

DS044

27

52

14.5

1767

DS060

31

56

16

2411

DS081

42

62

20

4521

DS087

31

56

16

2411

DS192

55

84

16

6417

DS133

55

84

16

6417

DS303

55

84

16

6417

Table 1: Foundation Requirements

Содержание DS015

Страница 1: ...Odyssey Easy Installation Guide...

Страница 2: ...ose q Nitrogen Boosters must have an suction receiver sized per Receivers section of this manual Ensure that suction and discharge receiver tanks are secured and bolted down q Place properly sized pre...

Страница 3: ...ge Pressure Sensing Lines 4 5 Flex Hose 5 6 Booster Installation 5 Power Supply 5 Plumbing 5 Piping 5 7 Discharge Receiver and Discharge Check Valve 6 Service Distance 6 General Information 7 Notice t...

Страница 4: ...per scfm Manual ball valves should be placed on either side of suction receiver to enable service isolation Tank should be placed within 10 of the booster See Receivers section 4 Suction Discharge Pre...

Страница 5: ...the booster Pipe systems must have rigid supports per local codes Power Supply Required A connection of proper voltage is required Voltage is listed on the inside of the door to the Odyssey control p...

Страница 6: ...or local regulation requirement whichever is furthest Recommended Booster should be placed with at least 18 distance between other components for serviceability and air circulation 7 Discharge Receive...

Страница 7: ...ntilated and well lit area that accommodates inspection and maintenance access Provide an unobstructed machine boundary of at least 18 with adequate air flow and service space around the booster The a...

Страница 8: ...s filter Damage to the machine will occur if contamination is drawn into the booster and will void the warranty Do NOT use pipe dope or excessive thread tape as these may damage the booster Boosters a...

Страница 9: ...sation tank sometimes called a buffer or suction receiver tank and a discharge receiver tank Discharge receiver tanks must be separated from the booster with a check valve Receivers should be sized as...

Страница 10: ......

Отзывы: