Assembly of the Tower
Remove the shipping straps from the tower as-
sembly.
Assemble the three tower sections by placing
each succeeding smaller tower section into the
next larger section.
Secure the tower legs using two (2) 3/8" x 3/4"
hex bolts per splice. The nuts (12) and bolts (12)
are packed in the carton containing tubes and
hardware.
Install the tower leg hinges and braces onto two
tower legs as shown in Figure 4.
Installation of Tubing Clamps
Select the proper size tube clamp as shown in
the chart. (See Figure 5B). When installing the
clamps, place the clamp near the tube end with
the top of the clamp over the slot in the tube as
shown in Figure 5A.
After adjustment of the tubing lengths, tighten
the clamp with a 5/16 inch nut driver, socket, or
open end wrench until the tubing will not twist
or telescope.
Figure 5A
Installation of Tubing Clamps
Содержание AV-18HT
Страница 9: ......
Страница 11: ...Figure 8 15 Meter Stub ...
Страница 12: ......
Страница 14: ...Figure 11 40 Meter Stub ...
Страница 21: ...Figure 16 VSWR Charts ...
Страница 22: ...Figure 17 Overall View of 18 HT S ...
Страница 25: ...The Hy tower base assembly has been changed Substitute this drawing for figure 2 on page 3 ...