©
EUROHEAT
DISTRIBUTORS (H.B.S) LTD. May 2012
E & OE Instructions Part number IN1244
26
Commissioning Check List
Inspect the door and glass seals and ensure all handle latches are adjusted correctly, procedure in the operating
instructions.
Check baffles are installed correctly and that the riddling mechanism is operating correctly.
Ensure that the fire responds to the operation of the controls and that there are no visible emissions of the
combustion products into the room.
Check the flue draught is within the parameters within these instructions. If the draught is excessive fit a
suitable flue stabiliser. If they are below the requirements, rectify whatever problem exists with the flue
installation.
Instruct the user on the use of the tools, operation of the appliance and the summer shut down procedure.
Information in the operating instructions.
Instruct the user never to operate the stove with the furnace door open and that the user is aware of the
requirement of a suitable fire guard where children, the old or infirm may come into contact with the
appliance.
Hand over the installation instructions, operating instructions and completed warranty form to the user. Remind
the owner to return the warranty form for registration.
Complete the Stoves Registration Form and Pass to User for
Registration
X
Mark box when completed
Euroheat and Hwam have a policy of continual research and development and reserve the right to modify its
appliances without prior notice.
We make every effort to ensure that the information provided in this document is correct and accurate at the
time of printing. Continued updates occur to adapt documents to customer requirements and appliance changes.
For the latest editions of all Euroheat documentation visit our web site:
www.euroheat.co.uk.
We would request that you inform Euroheat of information which you feel is not provided in this document which
would assist other users in the future.