![HVAC Partners KGANP26012SP Скачать руководство пользователя страница 17](http://html1.mh-extra.com/html/hvac-partners/kganp26012sp/kganp26012sp_installation-instructions-manual_2190341017.webp)
Before leaving installation, observe unit operation through 2 complete heating cycles. During this time, turn gas supply to gas valve off just long
enough to completely extinguish burner flame, then instantly restore full gas supply. To ensure proper low gas pressure switch operation, observe
that there is no gas supply to burners until after hot surface ignitor begins glowing.
PROCEDURE 11—LABEL APPLICATION
NOTE:
See Fig. 10 for label location.
1. Fill in Conversion Responsibility Label (326108–204) and apply to blower access panel as shown. Date, name, and address of organization
making this conversion are required.
2. Attach Conversion Rating Plate Label (326108–203) on blower shelf as shown.
3. Apply Gas Conversion Label (326108–202) to burner box cover as shown.
4. Reinstall main furnace door.
Fig. 20—Burner Flame
A89020
,
,
BURNER FLAME
BURNER
MANIFOLD
—17—
→
→
→
Содержание KGANP26012SP
Страница 18: ...18...
Страница 19: ...19...
Страница 20: ...2000 CAC BDP P O Box 70 Indianapolis IN 46206 agganp23 20 Book Tab 1 6a 4 8a Catalog No 63GA NP5...