![Huvema 19002 Скачать руководство пользователя страница 13](http://html1.mh-extra.com/html/huvema/19002/19002_manual_2190162013.webp)
12
3.
Preliminary Work Before start slotting process
Before start slotting edit, operator need to do following work:
①
. install the workpiece well
②
. Install slotting tool well
③
. Adjust suitable stroke length
④
. Adjust the suitable slotting top point and bottom point range
⑤
. Adjust the cutter lip parallel with X axis travel or two side of cutter surface
parallel with Y axis
⑥
. Measuring the cutter center and set the cutter center at workpiece center point
X0, Y0.
⑦
. Test cutting to get the first slotting point and set 0 point at graduation scale
ring.
⑧
. Select the suitable slotting speed in advance before start slotting.
4.
How to adjust slotting stroke length
Before start slotting process, operator must adjust suitable stroke length according
keyway length, usually the machine stroke length must longer at least 30 mm (25mm
at top po 5mm at bottom position), but if machine stroke length is not longer
100 mm than workpiece keyway length, operator no need to often adjust stroke length
every time.
Содержание 19002
Страница 1: ...HU 200K...
Страница 8: ...7 FOUNDATION 2 FRONT HU 200K...
Страница 17: ...16 Photo C Photo D Photo C D...
Страница 34: ...33 HU200K...
Страница 36: ...35 HU200K...
Страница 39: ...38 HU200K...
Страница 41: ...NOTE 2 ii OPERATION PANEL DESCRIPTION 1 POWER ON LAMP 2 RAM START RUN BUTTON 3 RAM STOP BUTTON 1 2 3 4 6 5...
Страница 42: ...NOTE 3 4 Coolant ON OFF Switch 5 Ram JOG Button 6 Emergency Stop Button...
Страница 48: ...NOTE 9 ELECTRIC CIRCUIT DIAGRAM...
Страница 50: ...NOTE 11...
Страница 53: ...2019 V1...