igfP-R3, R3P-0608
10
Boston 2000 eco Series
1. Attach the base and end/corner cap to the desired surface by inserting #8 pan head screws through the pre-slotted
holes in both the end cap and the base. Insert screws through the two holes of end cap and tighten.
a.
flexible top:
Butt end of the vinyl top against end/corner cap. While applying pressure, bend back vinyl top so that
vinyl legs are positioned within the base grooves. Roll vinyl top over full length of base, then tap with rubber mallet
to ensure vinyl is securely locked into the base.
b.
Rigid top:
Snap the Rigid Top over the Rigid Base.
3. If necessary wipe clean with any household cleaning product.
helpful hints:
● For best results, before cutting, install a scrap piece of base into vinyl top to achieve a clean cut.
● Set the uncoiled flexible vinyl at room temperature 24 hours prior to installation.
● Lubricate the inside of the vinyl with soapy water or silicone before installing.
● Over cut the flexible vinyl and compression fit. Adding the additional materials will compensate for stretching which
occurs during installation.
installation (cont'd)