Hussmann SC-21 Скачать руководство пользователя страница 12

U.S. & Canada 1-800-922-1919 • Mexico 1-800-890-2900 • WWW.HUSSMANN.COM

P/N 3148885_B

12

Complete Application Connections via Provisioning

View the StoreConnect Provisioning Tool Handbook for clarification on this step. This may be able to be 

completed on site. If the installation team has access to the provisioning tool, this can be completed on 

site. If not, please contact the StoreConnect team for help in this process.

General Information:

 

•  Use the StoreConnect Provisioning Tool to create application connections.

 

•  Use the StoreConnect Provisioning Tool to generate a configuration file via the Site Information page.

 

•  Go to MyStoreConnect website to confirm Controller connectivity by verifying case information    

 

    from each of the Controller on site.

StoreConnect Installation Checklist

The following is a standard Verification Test List and steps to complete.

 

•  SC-21

 

    Install SC-21 and verify connectivity over LTE with StoreConnect Admin.

 

•  Provision SC-21 MAC Address / Serial Number 

 

    Commit changes

 

    Contact StoreConnect networking support staff

 

•  Connected Refrigeration Controller

 

    Run CAT5 cable and verify connectivity to SC-21 

 

    Contact designated the provisioning personnel

 

 

•  Personnel check Application Connections step in Provisioning for populated

 

 

•  If designated Provisioning personnel is out of contact, contact StoreConnect networking 

 

                 support staff

 

•  Finishing

  Non-LTE 

Site

 

 

 

Plug in store internet cable to WAN port

 

 

 

Check with StoreConnect networking support staff 

 

 

 

If connectivity is verified, remove antennae

 

 

Optional: If networking is failing by both LTE and Store network, 

 

 

 

    contact StoreConnect Networking support staff

Содержание SC-21

Страница 1: ...ON P N 3148885_B July 2021 French P N 3148886 MANUAL STORE CONNECT SC 21 SITE INSTALLATOIN Site Planning Provisioning Guide I M P O R TA N T Keep in Store for Future Reference Store Connect Predictive Analytics System ...

Страница 2: ...e sure the work area is cordoned off Electrical LOTO Does the project require you to work with live electricity If yes have you received appropriate training Do you have appropriate locks and tags to de energize or isolate the electrical supply Read and observe all CAUTIONS and WARNINGS shown throughout these instructions Each person working on or near the installation described must wear safety g...

Страница 3: ...8595A TOBYL201 FCC Declaration of Conformity This device complies with Part 15 of the FCC rules Operation is subject to the following two conditions 1 this device may not cause harmful interference and 2 this device must accept any interference re ceived including interference that may cause undesired operation Radiofrequency radiation exposure Information this equipment complies with radiation ex...

Страница 4: ...QUIRED AND WHO COMPLETES THEM 6 STORECONNECT EQUIPMENT 6 STORECONNECT LITE 7 STORECONNECT 7 EQUIPMENT ANATOMY 7 RECOMMENDED MATERIAL LIST 9 STORECONNECT GENERAL INSTALLATION GUIDELINES 9 TIME ALLOTMENT 9 SPACE CONSTRAINTS PLANNING 9 INTERNET CONNECTIVITY 9 ETHERNET CABLES 9 STORECONNECT SITE INSTALLATION 10 FIND A LOCATION FOR STORECONNECT HARDWARE 10 INSTALL THE SC 21 10 CONNECTING THE REFRIGERAT...

Страница 5: ...1 for WAN 2 for Controllers 2 for Sensors Built in LTE modem Memory storage and computing power for all StoreConnect configuration installations Low power uses 24 volt 1 Amp DC AC Adapter included Specifications ELECTRICAL Input Voltage 8 to 60VDC Operating Current 0 25A Typical 24VDC MECHANICAL Dimensions 215 x 115 x 50mm 8 5 x 4 5 x 2 0in Weight 1 0lb 454 0g ENVIRONMENTAL Operating Parameters Te...

Страница 6: ...ct Provisioning Tool is an application used to enter store information into StoreConnect s database by the user This tool helps the user go step by step through the store s information and make it readable by the database For an in depth explanation of the StoreConnect Provisioning Tool see the Provisioning Tool Handbook What steps are required and who completes them Once the circuit schedule and ...

Страница 7: ...cations Data HUB AC Power Adapter for SC 21 Communications Data HUB High Gain LTE Antennas EthernetCAT5 6Cables tobebuiltonsiteduetoindividualsitelengthrequirements Shielded RJ45 Connectors StoreConnect StoreConnect Lite components above 5 or 8 port Ethernet switch optional Power Meters and Current Transducers CT s for all devices to be monitored Equipment Anatomy Figure 1 Case front and botom wit...

Страница 8: ... 3148885_B 8 Figure 2 Top of case showing LTE Antenna SMA connectors The photo below shows the Ethernet and power connections For any questions please reference the StoreConnect Handbook or contact your StoreConnect representative Figure 3 Ethernet and Power connectors ...

Страница 9: ... days for an installation Be aware of where the network switch for the store is located It may be required that the installation have a Cat5 6 cable run from the SC 21 to the network switch which will also include additional time Space Constraints Planning Depending on the refrigeration system equipment configuration space may be an issue If the site in cludes Power Meters it is best to locate the...

Страница 10: ...rollers and the power meters to minimize Cat5 cabling runs will reduce install time Generally a good location for the SC 21 is in the site s networking closet or inside the mechanical room near the refrigeration racks Power meter locations are best placed in close proximity to their respective suction group rack or protocol unit Install the SC 21 Electrical Connection Requires a 120V connection vi...

Страница 11: ...nnecting the Refrigeration Controller to the SC 21 Identify all Controllers at the site If there are multiple they will meet at a shared networking switch Run CAT5 cable from Controller Controller switch to the SC 21 this may require use of a lift to route cabling properly ConnectCAT5cablefromController ControllerswitchtotheSC 21computerportlabeled Contollers ...

Страница 12: ...m each of the Controller on site StoreConnect Installation Checklist The following is a standard Verification Test List and steps to complete SC 21 Install SC 21 and verify connectivity over LTE with StoreConnect Admin Provision SC 21 MAC Address Serial Number Commit changes Contact StoreConnect networking support staff Connected Refrigeration Controller Run CAT5 cable and verify connectivity to S...

Страница 13: ...assigned sites and use the tool Status LED State LED states State Solid Green System booting Flashing System operating normally and connected to the Internet Red Flashing Attempting to connect to the Internet Solid Red System Fault Troubleshooting The following is a list of potential issues that may arise during installation Please follow thetroubleshooting steps or refer back to the original proc...

Страница 14: ... installation support please contact the Hussmann Project Manager who coordinated the installation or your on site Hussmann Representative For all other StoreConnect sales and support inquiries please contact the Hussmann Service Contact Center Hussmann Service Contact Center 800 592 2060 HSM Service Hussmann com ...

Страница 15: ...ng missing must be reported to Hussmann not more than 30 working days from delivery to site not to exceed 60 days from date of shipment from Hussmann PATENT WARRANT Hussmann warrants that its products do not infringe the claims of any existing United States patent but Hussmann makes no warranty against infringement by reason of the use thereof either in combination with other products or in the op...

Страница 16: ...n the product is subject to negligence abuse misuse or when the serial number of the product has been removed defaced or altered For damages during shipment handling or installation or caused by fire flood strikes or other circumstances beyond its control For any damages delays or losses direct consequential incidental or otherwise which may arise in connection with such product or part thereof in...

Отзывы: