![Hussmann HGL-1BS Скачать руководство пользователя страница 4](http://html1.mh-extra.com/html/hussmann/hgl-1bs/hgl-1bs_installation-and-service-instructions-manual_2189293004.webp)
INSTALLATION CHECK LIST
HGL / HGM / HGS UPRIGHT CABINETS
Level cabinet front to back and left to right. Level doors and ad-
just torque as needed. On HGL cabinets, it is important this be
done to ensure proper operation of evaporator fan switches.
Is proper voltage supplied to cabinet?
Cut and remove compressor shipping band (HGL only)
Is timer set for correct time of day? Fail-safe at 40 minutes, de-
frost pins at 10 p.m. and 6 a.m. (HGL only)
Are electrical connections tight and tubing positioned to prevent
rubbing? Is drain hose in water pan and trapped?
Does the condenser fan blade (s) turn freely?
Is the temperature control set per the following specifications?
Control Set At
Cabinet Temperature
HGL
-18
-13
off -9
on
HGM/HGS
+29 to 30
+34 off
+40 on
Revised 5/99 lw
For more details on the above, refer to the Installation Booklet
sent with the cabinet.