wc_tx004557en.fm
19
MCT36-5 CN
Operation
4.5
Installing the Handle
The handle comes assembled with the pitch control knob
(a),
handle adjustment
knob
(b)
, throttle
(c)
, and
centrifugal stop
(d)
.
Installing the
handle
1. Make sure the throttle cable, pitch control cable
(e)
, and centrifugal stop wires
are accessible at the bottom of the handle
(f)
.
Note:
The throttle cable and centrifugal stop wires are routed through the smaller
tube
(g)
on the bottom of the handle. The pitch control cable is routed through the
main handle tube.
2. Remove the two bolts
(h)
and two nuts from the bottom end of the handle.
3. Route the pitch control cable out the slot in the bottom of the handle.
4. Install the handle to the handle base
(j)
.
5. Install the two bolts and two nuts to secure the handle to the handle base.
6. Route the pitch control cable around the yoke arm lever
(k)
and attach it to the
yoke.
This procedure continues on the next page.
a
b
c
d
wc_gr014640
wc_gr014641
g
f
h
e
j
k
Содержание Wacker Neuson MCT36-5
Страница 2: ...5100046425 01 0918 Operator s Manual Walk Behind Trowel MCT36 5 CN EN ...
Страница 14: ...wc_si001082en fm 14 Labels MCT36 5 CN 2 Labels 2 1 Label Locations A C D D E B C wc_gr015066 ...
Страница 46: ...wc_td000727en fm 46 Technical Data MCT36 5 CN Notes ...
Страница 50: ......
Страница 52: ......