
15
pick up water.
4. Place the Water Tube Assembly to the back of the
Blade Guard and insert the two 1/4” plastic nozzles
into the Ports on the side of the Blade Guard. To
prevent interference with the full movement of
the cart, it is recommended that the tubing and
electrical cord exit out the back between the rail and
pan, near the vertical post of the Frame.
5. Insert the male plug into the Receptacle on the
motor. The Water Pump will start when the mo-
tor is turned on. For dry cutting, the Water Pump
should be unplugged or removed to prevent
damage to the pump.
NOTE: If a motor is changed
from 230V power supply to 115V, the voltage
change switch will still allow the water pump outlet
to provide the same 115V to the water pump.
Install the Blade:
• Fill the Pan with clean water to fully submerge the water
pump screen. [27-1/2 gallons (105 litres)]
• Before connecting the power cord:
* Check the spindle nut to be sure it is tight and that
the blade rotates freely.
3
OPERATING PROCEDURE
NOTICE
Rotation direction is indicated by an arrow on
one side of the blade. Make sure the blade
contact surfaces are clean.
WARNING!
Always set the Motor
Switch (AA) to “OFF”
(STOP) position pri-
or to mounting the
blade.
. Be sure you are using the correct blade for the
material being cut. For example, blades are
available for cutting materials such as wall tile,
quarry tile, marble, slate and similarly hard
materials. For the best results, always use
genuine
Husqvarna
®
diamond blades. Contact
your nearest dealer to select the correct blade for
your specific cutting needs.
2. Rotate the Blade Guard fully up, tightening the wing
nut if needed to hold it in the fully raised position.
3. Remove the Blade Shaft Nut and the Outer Blade
Flange.
4. Check the blade for Counter Clockwise (CCW)
rotation and install on the spindle shaft.
5. Install the outer flange with the large diameter
against the blade. Tighten the Blade Shaft Nut with
the 15/16” Blade Shaft Wrench provided.
6. Lower the Blade Guard and retighten the wing nut
to securely hold the guard in place.
• Install the Drain Plug into the back end of the pan and
fill with clean water up to the bottom of the rails or, at a
minimum, until inlet filter of water pump is covered.
[27-1/2 gallons (105 litres)]
WARNING!
Take into account the working conditions from the
health and safety point of view.
WARNING!
Before starting up machine make sure you
completely read these instructions. Be fa-
miliar with operation of the machine before
operation!
Always pay extreme care and attention to the
preparation of the machine before starting.
Always keeps blade guard in place.
Remove all wrenches and tools from the
machine.
WARNING!
Check that the ON/OFF switch is in the “OFF” posi-
tion.
Only connect the power cord to a properly ground-
ed outlet of the correct voltage. See the decal near
the power cord for power requirements.
Connect the saw as close to the power supply as
possible. If needed, use the correct size three (3)
conductor extension cord to avoid excessive volt-
age drop.
Never use lamp cord type extensions.
Refer to the Recommended Extension Cords chart on
page 16.
• Turn the switch to
“ON”
. The blade should turn
counter-clockwise (CCW), when looking at the blade
guard side. The water pump will start automatically
when the motor starts. Adjustment of the water supply
may be made by means of the Control Valve.
• Follow the blade manufacturer’s recommendations for
dry or wet cutting.
Содержание TS 250 XS
Страница 18: ...18 WIRING DIAGRAM 1 1 2 HP MOTOR ...
Страница 19: ...19 WIRING DIAGRAM 2 HP MOTOR with AMMETER ...
Страница 20: ...20 2006 28 542 20 11 03 ...