![Husqvarna F2401U1 Скачать руководство пользователя страница 61](http://html.mh-extra.com/html/husqvarna/f2401u1/f2401u1_owners-manual_172655061.webp)
SERVICE WORK ON THE CHASSIS 11
59
11.13
Removing the lower triple clamp
Preparatory work
–
Raise the motorcycle with a lift stand. (
–
Remove the front wheel.
–
Remove the fork legs.
–
Remove the start number plate. (
–
Remove front fender. (
–
Remove the handlebar cushion.
S02316-10
Main work
(All models apart from special models)
–
Open cable holder
1
on the left and detach the wiring
harness.
–
Remove screw
2
.
–
Remove screw
3
.
–
Take off the upper triple clamp with the handlebar and
place to one side.
Info
Cover the components to protect them against
damage.
Do not kink the cables and lines.
A00507-10
(ROCKSTAR EDITION)
–
Open cable holder
1
on the left and detach the wiring
harness.
–
Remove screw
2
.
–
Remove screw
3
.
–
Take off the upper triple clamp with the handlebar and
place to one side.
Info
Cover the components to protect them against
damage.
Do not kink the cables and lines.
S02317-10
–
Remove O-ring
4
.
–
Remove protective ring
5
.
–
Remove the lower triple clamp with steering stem.
–
Remove the upper steering head bearing.
Содержание F2401U1
Страница 1: ...OWNER S MANUAL 2021 FC 450 FX 450 FC 450 ROCKSTAR EDITION Art no 3402445en ...
Страница 2: ......