SERVICE WORK ON THE CHASSIS 11
59
Guideline
Screw, top
steering stem
M8
20 Nm (14.8 lbf ft)
Loctite
®
243™
–
Tighten screws
1
.
Guideline
Screw, top triple
clamp
M8
17 Nm (12.5 lbf ft)
–
Check the steering head bearing for play. (
Finishing work
–
Mount the handlebar cushion.
–
Remove the motorcycle from the lift stand. (
11.13
Lubricating the steering head bearing
H02387-01
–
Remove the lower triple clamp.
–
Install the lower triple clamp.
Info
The steering head bearing is cleaned and lubricated
in the course of removal and installation of the lower
triple clamp.
11.14
Removing the start number plate
V01315-10
–
Remove screw
1
. Swivel the start number plate to one side.
–
Remove screw
2
and take off the brake line guide and start
number plate.
11.15
Installing the start number plate
V01316-10
–
Position the brake line and brake line guide on the start num-
ber plate.
–
Mount and tighten screw
1
.
–
Position the start number plate.
The holding lugs engage in the fender.
–
Mount and tighten screw
2
.
Содержание F2301V6
Страница 1: ...OWNER S MANUAL 2022 FC 450 FX 450 Art no 3402535en ...
Страница 2: ......
Страница 156: ...INDEX 154 rear right 13 W Work rules 8 ...