11 SERVICE WORK ON THE CHASSIS
56
11.10
Installing the lower triple clamp
S02307-10
Main work
–
Clean the bearing and sealing elements, check for damage,
and grease.
High viscosity grease (
–
Insert the lower triple clamp with the steering stem. Mount
upper steering head bearing.
–
Check whether upper steering head seal
1
is correctly posi-
tioned.
–
Slide on protective ring
2
and O-ring
3
.
S02318-10
–
Position the upper triple clamp with the handlebar.
–
Mount screw
4
, but do not tighten yet.
H01182-11
–
Position the fork legs.
Air bleeder screw
5
of the right fork leg is positioned to
the front.
Valve
A
of the left fork leg faces the front.
Info
Grooves are milled into the side of the upper end of
the fork legs. The second milled groove (from the top)
must be flush with the upper edge of the upper triple
clamp.
The air suspension is located in the left fork leg. The
pressure and rebound damping is located in the right
fork leg.
Содержание F2301V6
Страница 1: ...OWNER S MANUAL 2022 FC 450 FX 450 Art no 3402535en ...
Страница 2: ......
Страница 156: ...INDEX 154 rear right 13 W Work rules 8 ...