17
17.5.5
17.5.6
ENGINE
Installing the shift rails
-
Install shift rail
O
together with upper spring
8
and the lower spring.
-
Install shift rail (D together with upper spring
C,.
167
Installing the left engine case
-
Mount the dowels.
-
Degrease the sealing area. Apply the sealing compound to the left section of the
engine case.
I
Loctite
®
5910
-
Mount the left section of the engine case. If necessary, strike it lightly with a rub
ber mallet and turn the transmission shafts.
•
Info
I
Do not use the screws to pull the two sections of the engine case
together.
-
Mount screws
O
but do not tighten yet.
Guideline
I
Screw, engine case
I
M6x55
-
Mount screws
8
but do not tighten yet.
Guideline
10 Nm (7.4 lbf ft)
I
Screw, engine case
I
M6x65
I
10 Nm (7.4 lbf ft)
-
Mount screws (D and tighten all screws in a crisscross pattern.
Guideline
I
Screw, engine case
I
M6x85
-
Mount the screw connection of the engine fixing arm.
10 Nm (7.4 lbf ft)
Содержание F2101O1
Страница 1: ...PIONEERING SINCE 1903 REPAIR MANUAL2015 FC250 Art no 3403012en Husqvarna MOTORCYCLES ...
Страница 2: ......