3 HUSKYTOOLS.COM
Please contact 1-888-HD-HUSKY for further assistance.
Pre-Installation
PLANNING INSTALLATION
Decide where and how high you would like your track wall section installed.
You must start and finish on studs.
Studs should be centered 16 in. apart in order to support 75 lbs per square foot.
NOTE:
In order to support 75 lbs per square
foot, your studs must be a maximum of 16 in. apart.
TOOLS REQUIRED
Stud finder
Level
Pencil
Drill
Mitre saw
If you plan on
cutting your panels
Snips
For cutting trims
to length.
HARDWARE INCLUDED
Part
Description
Quantity
AA
Square-head bit
# 2
1
BB
2 in screws
(Dual Robertson & Phillips Pan head #8)
88
NOTE:
It is strongly recommended to use a drill
with the included square-head bit for all driving.
AA
BB