9
Installation method
1. Connect the main power to single-phase
power distribution box.
Install a circuit breaker (with capacity
of 30A or higher) in the distribution panel.
2. Remove the screws of the left side cover
and remove the cover of the inside control
box by the same method.
SIDE COVER
3 . Plug in the power cord and measure voltage at the ends of
two power cords (L, N) of termnal block.
4 . Measure the phase voltages.
They should match the voltage displayed in
'1-3'. If not, then using a straight headed
driver, adjust the PCB variable resistance
located in the control box at the bottom
front of the product as shown in the figure
on the right.
【 Electrical connection 】
Measurement must be taken by a qualified electrician and adjust voltage to values닏
displayed in '1-3'. Otherwise, icecream will be too waterly or too thick.
For Your
Information
●
Consult with the experts for the details of installation of the system to ensure optimal performance
of the system (change of the installation site of the system also requires consultation
with the engineer of the company).
●
Avoid uneven surface or place with direct sunlight, too much dust, or spattering water.
●
If the product is to be used for an extended period of time, reset the current time.
For Your
Information
◆ Earth shall be provided for the safe operation of the system.
◆ Maintain space of 50cm or more each between
the walls and the right and rear sides, 20cm or more
between the left of the system.
◆ Precisely seat the rubber feet at the bottom to prevent
slipping.
L
N
Содержание ISI-321TTA
Страница 30: ...30 Circuit diagram...
Страница 33: ...MEMO 33...
Страница 34: ...MEMO 34...
Страница 35: ...MEMO 35...
Страница 36: ...3240336 00 http www icetro com...